background image

2

Tilslutning, pumpesidemodul, PVP

Connection, pump side module, PVP

Anschluß, pumpenseitiges Modul, PVP

Raccordement, plaque d’entrée PVP

Tilslutning, grundmodul, PVB

Connection, basic module, PVB

Anschluß, Grundmodul, PVB

Raccordement, module de distribution, PVB

 

 

  Tilslutning   

Tilslutning 

Tilslutning 

Tilslutning 

  Tilslutning

Max. tilspændingsmoment   

  Connection   

Connection 

Connection 

Connection 

  Connection

Max. tightening torque 

 

  Anschluß   

Anschluß 

Anschluß 

Anschluß 

  Anschluß

Max. Anzugsmoment 

 

 Raccordement  

Raccordement  Raccordement  Raccordement 

 Raccordement

Couple de serrage maxi 

 

 

 

A/B 

LS, M, LSA, LSB,  

 

LX

 

 

 

 

 

 

 

PVH, Accu. 

PVS 

 

PVSI

Forskruning 

RG

Screwed connection 

BSP.F 

 1/2 in    3/4 in 

1/2 in 

3/4 in 

1/4 in 

1/8 in 

 

1/4 in 

Verschraubung 

R

Raccord 

G

med stålskive 

with steel washer 

 

130 Nm    210 Nm 

130 Nm 

210 Nm 

40 Nm 

17 Nm   

40 Nm

Weicheisen Dichtring 

 

(1150 lbf• in)    (1850 lbf• in) 

(1150 lbf •in) 

(1850 lbf• in) 

(350 lbf •in) 

(150 lbf• in)    (350 lbf •in)

avec rondelle en acier

med kobberskiv

with copper washer 

 

30 Nm 

 

50 Nm 

30 Nm 

50 Nm 

20 Nm 

15 Nm   

20 Nm

Kupfer Dichtring 

 

(270 lbf •in)    (445 lbf •in) 

(270 lbf •in) 

(445 lbf •in) 

(180 lbf •in) 

(135 lbf• in)    (180 lbf •in)

avec rondelle en cuivre

med aluminiumsskive

with aluminium washer 

 

70 Nm 

  110 Nm 

70 Nm 

110 Nm 

30 Nm 

1,5 daNm    3 daNm 

Aluminium Dichtring 

 

(620 lbf •in)    (970 lbf• in) 

(620 lbf• in) 

(970 lbf •in) 

(270 lbf• in) 

(135 lbf• in)    (270 lbf •in)

avec rondelle en aluminium

med skærekant

with cutting edge 

 

130 Nm    210 Nm 

130 Nm 

210 Nm 

40 Nm 

1,70 Nm   

40 Nm

mit Dichtkante 

 

(1150 lbf• in)    (1850 lbf •in) 

(1150 lbf• in) 

(1850 lbf •in) 

(350 lbf• in) 

(150 lbf •in)    (350 lbf •in)

tranchant

Forskruning

Screwed connection 

UNF 

7/8 in-14    1 1/16 in-12 

7/8 in-14 

1 1/16 in-12 

1/2 in-20 

3/8 inch-24    1/2 in-20

Verschraubung

Raccord

O-ring    

 

                  90 Nm 

   120 Nm                  90 Nm 

      120 Nm 

 30 Nm 

         10 Nm                  30 Nm

 

 

(800 lbf•in)    (1060 lbf•in) 

(800 lbf•in) 

(1060 lbf•in) 

(270 lbf•in) 

(90 lbf•in)    (270 lbf•in)

Summary of Contents for NL140RKT

Page 1: ......

Page 2: ......

Page 3: ...IN THE BASKET TO INCREASE HEIGHT DO NOT ANCHOR THE BASKET TO ANY STRUCTURE DO NOT RAISE THE BASKET IF THE MACHINE IS NOT LEVELLED WITHIN THE 5o LIMIT DISPLAYED ON THE LEVEL BUBBLE DO NOT STAND ON THE...

Page 4: ...S OR REAR ONLY STABILISERS MUST NOT BE USED ON SIDE SLOPE IF THE MACHINE IS TO BE OPERATED ON A SIDE SLOPE IT MUST BE POSITIONED SO THAT THE VEHICLE IS FACING UP THE SLOPE I E THE CAB OF THE VEHICLE I...

Page 5: ...k located at the centre of the transmitter must be moved and held either to the left or to the right as indicated Once the deadman has been activated the EWP functions bottom boom lift top boom lift t...

Page 6: ...d of time the engine may be stopped by pressing the ENGINE START STOP button When required the engine may be started again by pressing the ENGINE START STOP button again Emergency DC Pump GROUND trans...

Page 7: ...ng The accumulator located on the vehicle is kept charged i e pressurised while the vehicle engine is running during normal operation of the work platform When charged it holds a volume of hydraulic o...

Page 8: ...CKOUTS WILL NOT OPERATE UNLESS THE TOP BOOM OF THE WORK PLATFORM IS STOWED WARNING DEFLATE AIRBAG SUSPENSION IF FITTED BEFORE ENGAGING SPRING LOCKOUTS To operate the spring lockouts depress the deadma...

Page 9: ......

Page 10: ......

Page 11: ......

Page 12: ......

Page 13: ......

Page 14: ......

Page 15: ...NIFTY LIFT SYSTEM COMPONENTS CIRCUIT DIAGRAMS 24 00 18...

Page 16: ......

Page 17: ......

Page 18: ......

Page 19: ......

Page 20: ...I19 I10 I9 I11 I12 Q6 Q5 I13 I14 I15 I16 I17 I18 Q8 Q7 Q9 Q10 Q11 Q12 Q13 Q15 I20 Q14 Q16...

Page 21: ......

Page 22: ......

Page 23: ......

Page 24: ......

Page 25: ...DC PUMP POWER TOOLS ENGINE START STOP UPPER BOOM LOWER UPPER BOOM RAISE LOWER BOOM LOWER BOOM EXTEND BOOM RETRACT SLEW CW LOWER BOOM RAISE SLEW CCW NIFTY LIFT N12335 DEADMAN F3 Z3H G2 Z2L F2 Z2H G3 Z...

Page 26: ...ar with mechanical procedures Before operating the machine the operator must be sure that the machine has been properly maintained The operator should carry out the daily inspections described in this...

Page 27: ...eck guardrails sideboards and floors for damage Inspect critical welds at base and frame for signs of cracks damage or distortion Check pins and bushes for wear Check condition of insulation covers bo...

Page 28: ...f damaged or missing Check all Emergency systems emergency batteries and charging system operation of electric pump and emergency controls Check for correct operation of spring lockouts and or stabils...

Page 29: ...mage or hose wire damage Check speed of all operations see separate spec sheet Check directional arrows function correctly if fitted Check revolving lamps if fitted Electrical test unit Fill out opera...

Page 30: ......

Page 31: ......

Page 32: ......

Page 33: ......

Page 34: ......

Page 35: ......

Page 36: ...nd Serien nummer G PVM Woche und Jahr der Herstellung C PVG num ro semaine et ann e de montage et num ro s riel D PVP r glage de pression E PVP num ro semaine et ann e de fabrication et num ro s riel...

Page 37: ...Nm Weicheisen Dichtring 1150 lbf in 1850 lbf in 1150 lbf in 1850 lbf in 350 lbf in 150 lbf in 350 lbf in avec rondelle en acier med kobberskiv with copper washer 30 Nm 50 Nm 30 Nm 50 Nm 20 Nm 15 Nm 20...

Page 38: ...le de 22 5 C H ndtaget skal skrues helt i bund C Screw the lever completely home C Den Hebel v llig einschrauben C Visser le manipulateur entierement au fond Fod med en vinkel p 37 5 Base with an angl...

Page 39: ...15 V 22 30 V Pin 1 2 1 2 Q P A UDC 0 UDC 0 Q P B 0 UDC 0 UDC Neutral 0 0 0 0 UDC 11 15 V 22 30 V Pin 1 U 2 US 1 U 2 US Q P A UDC 0 5 0 25 x UDC UDC 0 5 0 25 x UDC Q P B UDC 0 5 0 75 x UDC UDC 0 5 0 75...

Page 40: ...V 22 30 V Pin 1 2 1 2 Q P A 0 UDC 0 UDC Q P B UDC 0 UDC 0 Neutral 0 0 0 0 UDC 11 15 V 22 30 V Pin 1 U 2 US 1 U 2 US Q P A UDC 0 5 0 75 x UDC UDC 0 5 0 75 x UDC Q P B UDC 0 5 0 25 x UDC UDC 0 5 0 25 x...

Page 41: ...id valve B Magnetventil B Electrodistributeur Gr n Green Gr n Vert A Eksternt rel A External relay A Externes Relais A Relais externe B Magnetventil B Solenoid valve B Magnetventil B Electrodistribute...

Page 42: ...tagsvandring i neutralstilling 1 S t hydraulisk tryk p systemet 2 Tilslut forsyningssp nding UDC Signalsp nding 0 5 x UDC eller afbryd signalsp nding US Check max lever travel in neutral position 1 Ma...

Page 43: ...aulic build up of PVEK it may be necessary to bleed the PVEK A non bleed PVEK may among others give rise to abnormal vibrations in the PVEM lever Udluftning wenn die Gruppe vertikal montiert ist empfe...

Reviews: