6
INSTALLATION PROCEDURE: Pipe Arrangement
2.2
Pipe Arrangement
Connect the pump and the tank to the main body.
The following describes one pump as “PUMP 1” and the other pump as “PUMP 2”.
1
Connect the couplers to the ends of the feedwater hoses (n = 2).
1) Pass the hose band-S to the end of the feedwater hose on which there is no connector.
2) Place the coupler in the end of the feedwater hose on which there is no connector as far
as it goes.
3) Tighten the hose band-S to fix the coupler.
2
Connect the power cord and feedwater hose of PUMP 1 to the main body.
1) Connect the power cord of PUMP 1 to
the extension cord.
2) Connect the extension cord to the
COOLING outlet at the rear side of the
main body.
3) Connect the coupler of the feedwater
hose to the COOLING inlet at the rear
side of the main body.
4) Connect the other end of the feedewa-
ter hose to PUMP 1.
3
Connect the power cord and feedwater
hose of PUMP 2 to the main body.
1) Connect the power cord of PUMP 2 to
the extension cord.
2) Connect the other end of the extension
cord to the CLEANING outlet at the rear
side of the main body.
3) Connect the coupler of the feedwater
hose to the CLEANING inlet at the rear
side of the main body.
Push it until the coupler clicks in.
4) Connect the other end of the feedwater hose to PUMP 2.
4
Fill up the tank 80% with water, and close the cover.
5
Attach the drain cover (part of
) to the outlet in the grinding chamber.
RS232C
BAR CODE
FEEDER
LAN
AC INLET
COOLING 2A
CLEANING 2A
VACUUM 2A
COOLING
CLEANING
COOLING outlet
CLEANING outlet
COOLING inlet
CLEANING inlet
Drain pipe
Summary of Contents for SE-9090 Express
Page 6: ...IV...
Page 8: ...2 REQUIREMENTS Requirements...