HG200 - 200 Inverter

It   is   absolutely   prohibited   to 

disassemble or access the internal parts of 
the   hoist   without   first   cutting   off   the 
power supply by pulling the plug out of 
the power outlet.

The operator must work in a safe position, 
i.e. so that the is protected against falling and 
so that he has an unobstructed view of the 
trajectory of the moving elements.
If   the   operator   uses   safety   belts   to   protect 
himself   against   falling,   they   must   be 
anchored   to   fixed   parts   and   absolutely 
immovable.
- Access to the area underneath the vertical 
axis   of   the   load   must   be   prohibited   to 
persons or at least a sign must indicate the 
danger due to suspended loads.
The user must still check that there are no 
persons in the area underneath the vertical 
axis of the load.

The   loads   must   be   lifted   with   a 

vertical pull and therefore it is prohibited 
to use the hoist with an oblique lift.

-   It   is   recommended   to   sling   the   load 
perfectly and to use adequate containers for 
liquid or sandy substances.
- It is prohibited to use the lifting cable to 
sling the load (see drawing).

- It is prohibited to grab or touch the 

lifting   cable   while   lifting   or   lowering   the 
load,   in   particular   near   the   lifting   limit 
switch.

-   The   machine   is   built   with   an   IP44   motor 
meaning that it is protected against solid bodies 
with sizes that are greater than one millimetre 
and against water infiltration in all directions.
Therefore, it is prohibited to use the machine in 
environments that are saturated with gas or if 
exposed to direct streams of water or rain.
- It is also recommended to:
a) avoid overloading the hoist;
b) stop the lifting movement  before the limit 
switch trips since it should only be used in case 
of emergency;
c)   check   that   the   voltage   does   not   decrease 
excessively during the start-up phase (this may 
prevent the brake from opening);

d)   make   sure   that   the   cable   does   not 

completely unwind; at least 2 turns of the cable 
must remain on the drum to avoid damage due 
to the direct action of the load on the clamp 
that attaches the cable.
The   cable   wound   on   the   hoist   drum   has   a 
length   that   is   greater   than   the   maximum 
foreseen use height.
e)   (using   the   special   set   screw)   place   the 
rotation shaft  of the  cable  winder  drum  in a 
horizontal position to guarantee that the cable 
will be correctly wound on the drum.
f) The cable maximum winding diameter must 
guarantee a free space on the sides of the drum 
equal to 1,5 times the cable diameter.

Note:   The   manufacturer   declines   all 
responsibility   for   injury   to   persons   or 
damage   to   property   as   a   result   of   non-
compliance   with   the   above-mentioned 
standards.

MAINTENANCE

 

The entire device is built with class 

A4   which   corresponds   to   84000   operating 
Cycles.
The   mechanism   are   built   with   class   M4 
which corresponds to 3200 h of operation.
After   the   number   of   operating   cycles 
described   above,   the   machine   must   be 
overhauled at a T.E.A.   authorised service 
centre.

English

Pag 8

Summary of Contents for HG 200

Page 1: ...arranty the machine must be delivered at the user s care and expense to a TEA authorised service centre The manufacturer will not be responsible for any other damage including the damage as a result o...

Page 2: ...cient Number of bearing sections Polished steel 5mm 133 wires 0 32 mm 200 kg mm 1600 Kg 8 1 Polished steel 6mm 133 wires 0 40 mm 200 kg mm 2400 Kg 8 1 HOOK Single with anti release device Capacity 750...

Page 3: ...HG200 200 Inverter INSTALLATION The hoist can be installed in different ways depending on the type of use The diagrams below provide some examples of possible installations a b c English Pag 3...

Page 4: ...hoists installed on the ground in addition to being solidly anchored must also be installed so that the cable unwinds from the lower part of the drum The operator of projecting hoists attached to scaf...

Page 5: ...and toe board b An opening may be left to pass a shovel or bucket provided that a toe board with a height of no less than 30 cm is installed at that point The opening must be reduced to what is stric...

Page 6: ...erencia de fabricaci n V Tensione di alimentazione Power supply voltage Tension d alimentation Netzspannung Tensi n de alimentaci Hz Frequenza Frequency Fr quence Frequenz Frecuencia Rpm Giri al minut...

Page 7: ...or equal to 4 mm The hoist is controlled through a special control panel which includes an up button and a down button as shown in the following diagram The hoist is controlled through a special contr...

Page 8: ...water infiltration in all directions Therefore it is prohibited to use the machine in environments that are saturated with gas or if exposed to direct streams of water or rain It is also recommended...

Page 9: ...mber is indicated next to the name of each part The request for spare parts must be submitted to a TEA service centre or to a dealer It must include the following a hoist model and serial number b pie...

Page 10: ...hoist at the selected speed Attention the speed will increase gradually from the lowest speed to the selected speed It is possible to vary the speed of ascent or descent during motion by using the swi...