background image

HG200 - 200 Inverter

The hoist can be connected (on the round or 
wall   mounted)   using   sized   tubular   elements 
inserted   into   the   holes   on   the   base   of   the 
machine   frame   and   then   anchored   to   the 
support structures.

If the hoist is installed according to methods a) 
and b), the user must follow the instructions 
listed below:

The   uprights   of   the   scaffolding,   when   the 
lifting equipment is attached directly to them, 
must be reinforced and braced to ensure a solid 
condition   that   is   adequate   to   withstand   the 
greater stress and strain forces.

With   metallic   scaffolding,   there   must   be   an 
adequate   number   of   uprights,   on   which   the 
hoists are directly attached, and, in any case, 
no less than two.

The rotating arms bearing the pulleys and any 
hoist   drums   must   be   solidly   attached   to   the 
uprights   using   brackets   with   screw   bolts 
supplied with a nut and counternut. The same 
situation is required for the cable transmission 
pulleys   at  the  foot   of  the  uprights  when  the 
drums are installed on the ground.

The hoists installed on the ground, in addition 
to   being   solidly   anchored,   must   also   be 
installed so  that the cable  unwinds  from  the 
lower part of the drum.

The   operator   of   <<projecting>>   hoists 
attached to scaffolding uprights, when guards 
cannot be attached to the sides and the front of 
the control position, must wear a safety belt.

The protection described in point "c" on page 
5   must   be   applied   even   for   the   worker 
receiving the loads on the normal scaffolding.

In  any  case,  the  machine  must  be  anchored  
and any rotating arms bearing the trasmission 
pulleys must be installed on a stable structure  
according to the calculations and instructions 
supplied by a legally qualified technician who 
must issue a special certificate.

For   calculation   purposes   and   to   verify   the 
stability, the forces acting on the connections 
under   the   most   severe   load   condiction   are 
reported in the following table (hoist with a 
maximum capacity of 200 Kg (HG200-2O0 
INVERTER) .

This   considers   the   load   acting   in   the   two 
positions   at   the   ends   of   the   drum   and   the 
weight of the hoist itself is neglected.

English

Pag 4

HG200

F

Pos. 1

Pos. 2

( N )

( Kg )

( N )

(Kg )

F

1

1283

131

854

87

F

2

967

99

538

55

F

3

210

21

639

65

F

4

-106

-11

323

33

Summary of Contents for HG 200

Page 1: ...arranty the machine must be delivered at the user s care and expense to a TEA authorised service centre The manufacturer will not be responsible for any other damage including the damage as a result o...

Page 2: ...cient Number of bearing sections Polished steel 5mm 133 wires 0 32 mm 200 kg mm 1600 Kg 8 1 Polished steel 6mm 133 wires 0 40 mm 200 kg mm 2400 Kg 8 1 HOOK Single with anti release device Capacity 750...

Page 3: ...HG200 200 Inverter INSTALLATION The hoist can be installed in different ways depending on the type of use The diagrams below provide some examples of possible installations a b c English Pag 3...

Page 4: ...hoists installed on the ground in addition to being solidly anchored must also be installed so that the cable unwinds from the lower part of the drum The operator of projecting hoists attached to scaf...

Page 5: ...and toe board b An opening may be left to pass a shovel or bucket provided that a toe board with a height of no less than 30 cm is installed at that point The opening must be reduced to what is stric...

Page 6: ...erencia de fabricaci n V Tensione di alimentazione Power supply voltage Tension d alimentation Netzspannung Tensi n de alimentaci Hz Frequenza Frequency Fr quence Frequenz Frecuencia Rpm Giri al minut...

Page 7: ...or equal to 4 mm The hoist is controlled through a special control panel which includes an up button and a down button as shown in the following diagram The hoist is controlled through a special contr...

Page 8: ...water infiltration in all directions Therefore it is prohibited to use the machine in environments that are saturated with gas or if exposed to direct streams of water or rain It is also recommended...

Page 9: ...mber is indicated next to the name of each part The request for spare parts must be submitted to a TEA service centre or to a dealer It must include the following a hoist model and serial number b pie...

Page 10: ...hoist at the selected speed Attention the speed will increase gradually from the lowest speed to the selected speed It is possible to vary the speed of ascent or descent during motion by using the swi...

Reviews: