6
Major service interval guide.
Work impact considerations
Severity index
Wide M
Wide L
Jack-knife boom pole.
15%
N/A
High dust and sand environment.
10%
10%
High salinity environment.
10%
10%
Aluminium fence installed.
5%
5%
Mobile pole support installed.
15%
15%
Ambient temperature above 40
o
C or below 0
o
C.
5%
5%
Operation regularly interrupted by safety beam circuit trigger.
15%
15%
Operation regularly interrupted by the Emergency Stop circuit trigger.
15%
15%
Speed set to above 50%.
15%
15%
Safety overload force level set to above 50%.
10%
10%
0
100.000
200.000
300.000
cicli di manovr
e
400.000
500.000
10 20 30 40 50
Indice di gravosità (%)
60 70 80 90 100
Severity index (%)
manoeuv
re cycles
Using the above table, total up the applicable work impact consider-
ations to calculate the site’s severity index. Apply the totalled up se-
verity index % to the graph on the right to estimate the total expected
number of operations before first major service.
Summary of Contents for WIDE L
Page 12: ...12 Adjusting the end stops...