EN
English –
3
POSITION OF LIMIT SWITCHES
4
3.6 - Installation of BIG METRO Gearmotor
1
Remove the nuts and washers shown in the figure on the right (
fig. 5
).
2
Place the gearmotor inside the foundation box making sure it faces the cor-
rect direction.
3
Secure the gearmotor with the previously removed washers and nuts.
4
Connect the gearmotor to the gate by means of the connecting lever (2)
(
fig. 4
).
5
Closing limit switch
(supplied with the
motor) mount as shown in the figure
Opening limit switch
(supplied with the
motor) mount as shown in the figure