3.5 - Mounting: Overall Dimensions and Positioning of
Foundation Box
1
Dig a generously sized foundation pit to house the foundation box (
fig. 3
):
prepare a drain pipeline for draining off water and avoid the build-up of
water.
2
If the gate is equipped with its own mechanical stops (
fig. 2
) skip directly to
point 3. Otherwise secure the opening limiter accessory to the box (see
paragraph 4).
3
Place the box inside the foundation hole; the stud must be aligned with the
axis of the hinge (
fig. 3
).
3
1- Hinge
2- Pin
3- Concrete
1
2
3
4
5
4
Release lever
2 Connecting lever
3 Ball
4 Control bracket
5 Pin
2
1
Photocell post
5
Aerial
9
Vertical electric lock
2
Pair of opening stops
6
Flashing light
10
Key-operated selector switch or
3
230V line
7
Photocell
digital keypad
4
Control panel (electrical panel)
8
Box with BIG METRO actuator
11
Connector block (not supplied)
4
Provide a duct for the electrical cables and a drainage pipe.
5
Bury the foundation box in concrete, making sure it is set level.
6
Mount the control bracket on the box’s stud along with the ball (
fig. 4
).
7
Set the gate leaf on the release lever and weld them securely.
8
Grease using a suitable grease nozzle.