background image

11

11

Step 7:

Control Box Installation

Mount the control box so that (8 ft) will reach
the motor.

Do not mount the control box

where the person using the push button
on side of the box can come in contact
with the gate.

Use mounting hardware

capable of supporting the weight of the
control box with the battery installed.

Set battery inside of control box with
terminals toward the front

(Do not use any

battery with side terminals).

Step 8:

Connect harness to motor

Route the cable from the control box to the operator. Connect the cable to the
side of the terminal block on the operator as shown. The operator in this manual
is set up for left side installation (from inside looking at gate in closed position).
For right side installation reverse the open and close wiring and reverse the mo-
tor leads.

OPEN LIMIT

(ORANGE)

GROUND

(GREEN)

CLOSED LIMIT

(WHITE)

MOTOR (+)
(RED)

MOTOR (-)
(BLACK)

ENCODER
(BLUE)

ENCODER
(YELLOW)

Summary of Contents for HYPPO DUALETL

Page 1: ...INSTALLATION MANUAL 08 10 HYPPOETL HYPPO DUALETL 12 VOLT DC Swing Gate Operator Manufactured by NICE SpA...

Page 2: ...perator Components 6 Operator Dimension 7 Operator Installation 8 Electrical Connections 11 Encoder Board Connections 12 Limit Adjustments 13 Battery Connections 14 Programming Current Sensing 15 Cont...

Page 3: ...with operator controls Keep the remote con trol away from children Always keep people and objects away from the gate NO ONE SHOULD CROSS THE PATH OF THE MOVING GATE ARM Test the operator monthly see...

Page 4: ...outages The battery may be recharged with a trickle charger or by solar energy eliminating the need for costly trenching to remote entrances If a trickle charger is used and a standard electrical out...

Page 5: ...d If additional cable is required do not cut out the blocking diode when adding the cable 4 Is electricity available if required Consider safety and access options Recommend if needed 1 Will there be...

Page 6: ...Assembly b Arms two pieces c Attach Bracket d Mounting Hardware e Manual Release Handel and Lock Keys f Control Box g Cable 8 FT OR 38 FT Single or Dual h Caution signs 2 I Battery Charger optional J...

Page 7: ...Operator Dimensions and Arm Lengths Standard Arms Extended Arms PART NH HYA12 Amax 5 7 8 15 3 4 Bmax 13 3 4 17 3 4 Cmax 17 3 4 31 1 2 13 3 4 6 1 2 9 1 2 6 3 1 2 Note Extended arms are ordered separat...

Page 8: ...8 Step 1 Disengage Motor using manual release and remove cover Operator Installation...

Page 9: ...the gate where the operator will attach B Install mounting bracket using cart below Note Mounting bracket may be either welded or bolted 17 3 4 B 3 1 2 4 3 8 5 7 8 7 7 8 9 7 8 11 13 16 13 3 4 A 4 3 8...

Page 10: ...install motor on bracket and install and arm assembly Push the arms assembly up against the gate in the closed position Tack weld or c clamp the gate bracket to the gate Per manent welds or bolt at ta...

Page 11: ...box with terminals toward the front Do not use any battery with side terminals Step 8 Connect harness to motor Route the cable from the control box to the operator Connect the cable to the side of the...

Page 12: ...12 SIREN GND Harness BLUE YELLOW YELLOW RED BLACK Step 9 Connecting the Motors to the Board Harness is factory wired in the control box as shown on this page...

Page 13: ...ar until the open limit LED illuminates Step 11 Re install Cover and re engage manual release Hint To test wiring of motor do the following 1 Put gate 1 2 way closed and plug main harness into emergen...

Page 14: ...mpere hour battery is recommended with solar charging BAT12V33 12 Volt 33 to 34aH Sealed Battery Connect the two ring terminals on the connec tor end of the cable to the battery The battery charger or...

Page 15: ...cedure 1 Press and hold the LED ENABLE see page 13 button for five seconds and release The STOP LED will blink indicating that the board is in learn mode 3 Cycle gate arm for 3 4 full cycles The STOP...

Page 16: ...Battery Polarity Indicators Optional Device Input Remote Monitor Outputs Microprocessor Timer To Close Dual Gate Delay Current Sensitivity Adjustments Program Switches 835 836 Control Board Parts Iden...

Page 17: ...ximum travel or the 15 amp fuse will open Fuse should be checked before returning gate to service EMERGENCY BYPASS 12V Supplied battery voltage SLV Slave Operator Indicator indicates slave side of gat...

Page 18: ...to assist in installation and troubleshooting Hold the push button down for five seconds to put the board in program mode RESET Resets the microprocessor Returns processor to last known state Jumpers...

Page 19: ...eased 6 LOCK TYPE For 12V mechanical solenoid locks For 12V magnetic locks 12V for 4 seconds on open cycle 12V when on close limit 7 COAST ENABLE Gate will stop immediately when at Gate will coast min...

Page 20: ...ion see program switch 5 for options OPEN Open input from a 3 button station see program switch 5 for options GND Supplied Battery Ground GND Supplied Battery Ground FREE EXIT Opens gate if closed sto...

Page 21: ...or on the Remote Monitor Output Connector block Connect the black wire to the GND connector on the Remote Monitor Output Connector block Red Black Set Program Switch 4 as preferred ON Upon activation...

Page 22: ...itches to the same position Transmitters must match code switches for proper operation If power is taken directly from battery or connected as shown below receiver should be configured for 12VDC Multi...

Page 23: ...Lead Acid Recommended Battery solar charged 12 V 105 aH Battery Charger 1 5 or 6 amp Automatic Recommended Solar Panel 5 watt minimum Duty Cycle 40 with proper charging Operating Temperature 400 F 15...

Page 24: ...lightning The manufacturer will not be responsible for any labor charges incurred in the removal or replacement of defective parts In case of failure due to defective material or workmanship during t...

Reviews: