Transport
VPB 200N should be transported and stored vertically in
a dry place. The VPB 200N may, however, be carefully
laid on its back when being moved into a building.
R
0
R
0
Assembly
႑
The water heater is only designed for upright installa-
tion.
႑
Position the water heater on a firm base that can bear
its weight, preferably on a concrete floor or founda-
tion. Use the water heater’s adjustable feet to obtain
a horizontal and stable set-up.
႑
Pipes must be routed from the safety valve to a suit-
able floor drain.
Installation area
Approx 425 mm free space is required on the left side
and in front of the water heater in order to replace the
immersion heater.
0
0
(425*)
(425*)
* Service space for replacing the immersion heater.
VPB 200N
Chapter 2 |
Delivery and handling
6
2 Delivery and handling
Summary of Contents for VPB 200N
Page 1: ...Installer manual LEK VPB 200N Hot water heater IHB GB 1046 3 031453...
Page 2: ......
Page 6: ...VPB 200N Chapter 1 Important information 4...
Page 24: ......
Page 25: ......
Page 26: ......
Page 27: ......