
F2030/F2300
F2030/F2300 is equipped with a terminal block (X3) for
a heating cable. The connection is fitted with a 250 mA
fuse at the factory.
Fuse location F2030
F3
X3
Fuse
NIBE Part no.
Fuse (F3)
P
tot
(W)
Length
(m)
718 085
T100mA/250V
15
1
518 900*
T250mA/250V
45
3
718 086
T500mA/250V
90
6
*Fitted at the factory.
Fuse location F2300
F3
X3
Fuse
NIBE Part no.
Fuse (F3)
P
tot
(W)
Length
(m)
718 085
T100mA/250V
15
1
518 900*
T250mA/250V
45
3
718 086
T500mA/250V
90
6
*Fitted at the factory.
Electrical connection
Connect external heating cable (EB14) to terminal block
X3:4 and 7 as illustrated below:
5
6
7
4
2
3
1
KVR 10
F2030/F2300
X3
EB14
Heating cable
F3
Condensation water pipe KVR 10
Chapter 3 |
Electrical connection
10
Summary of Contents for KVR 10
Page 1: ...Installer manual LEK Condensation water pipe KVR 10 Accessories IHB GB 1646 3 331785...
Page 2: ......
Page 27: ......