Item register
A
Accessibility, electrical connection, 24
Accessories, 40
Addressing via multi-heat pump operation, 28
Adjustment, charge flow, 30
Alarm list, 37
Assembly, 9
B
Basic actions, 32
C
Checklist, 8
Commissioning and adjusting, 29
Adjustment, charge flow, 30
Compressor heater, 29
Inspection of the installation, 29
Preparations, 29
Readjusting, heating medium side, 30
Start-up and inspection, 29
Topping up the climate system, 29
Venting the climate system, 29
Component location HBS 05 (EZ102), 12
Compressor heater, 29
Connecting accessories, 28
Connection between HBS 05 and AMS 10, 24
Connection between HBS 05 and SMO, 26
Connection between HBS 05 and VVM, 25
Connections, 28
Control - Heat pump EB101, 31
Control – Heat pump EB101
Heat pump menu 5.11.1.1, 31
D
Delivery and handling, 9
Assembly, 9
Installation area, 10
Removing the covers, 11
Supplied components, 10
Transport and storage, 9
Dimensions, 41
Disturbances in comfort, 32
Troubleshooting, 32
Docking alternatives, 19
Explanation, 21
E
Electrical circuit diagram, 44
Electrical components, 24
Electrical components HBS 05, 14
Electrical connections, 22
Accessibility, electrical connection, 24
Addressing via multi-heat pump operation, 28
Connecting accessories, 28
Connection between HBS 05 and AMS 10, 24
Connection between HBS 05 and SMO, 26
Connection between HBS 05 and VVM, 25
Connections, 28
Electrical components, 24
External heating cable (KVR 10), 28
General, 22
Electrical panel, 14
Explanation, 21
External heating cable (KVR 10), 28
G
H
HBS 05 does not communicate, 32
HBS 05 is not operational, 32
Heat pump menu 5.11.1.1, 31
High room temperature, 32
I
Important information, 4
Marking, 4
Recovery, 6
Safety information, 4
Symbols, 4
System solution, 4
Inspection of the installation, 7, 29
Installation area, 10
Insulating refrigerant pipes, 18
L
Large amount of water below HBS 05, 32
List of components HBS 05 (EZ102), 13
Low hot water temperature or no hot water, 32
Low room temperature, 32
M
Marking, 4
P
Pipe connection, 17
Pipe connections, 15
Docking alternatives, 19
General, 15
Insulating refrigerant pipes, 18
Pipe connection, 17
Pipe coupling heating medium circuit, 19
Pressure drop, heating medium side, 19
Pressure test and leak test, 18
Refrigerant pipe, 16
Topping up the refrigerant, 18
Vacuum pump, 18
Pipe coupling heating medium circuit, 19
Preparations, 29
Pressure drop, heating medium side, 19
Pressure test and leak test, 18
R
Readjusting, heating medium side, 30
Recovery, 6
Refrigerant pipe, 16
Removing the covers, 11
S
Safety information, 4
Inspection of the installation, 7
Marking, 4
Safety precautions, 4
Serial number, 6
Symbols on HBS 05, 4
Safety precautions, 4
Sensor placement, 33
Serial number, 6
Start-up and inspection, 29
Supplied components, 10
Symbols, 4
Symbols on HBS 05, 4
System solution, 4
T
Technical data, 41
Dimensions, 41
Electrical circuit diagram, 44
HBS 05
Chapter 12 |
Item register
46
12 Item register
Summary of Contents for HBS 05 Series
Page 1: ...Installer manual LEK HBS 05 HBS 05 6 05 12 05 16 SPLIT box IHB EN 1746 1 331901...
Page 2: ......
Page 11: ...Removing the covers HBS 05 LEK LEK LEK LEK 11 Chapter 2 Delivery and handling HBS 05...
Page 48: ......
Page 49: ......
Page 50: ......