Inspection of the installation
Current regulations require the heating installation to be inspected before it is commissioned. The inspection must
be carried out by a suitably qualified person. In addition, fill in the page for the installation data in the User Manual.
Date
Signa-
ture
Notes
Description
✔
Ventilation (page
)
Setting ventilation flow exhaust air
level 1
Setting ventilation flow exhaust air
level 2
Setting ventilation flow exhaust air
level 3
Setting ventilation flow supply air
level 1
Setting ventilation flow supply air
level 2
Setting ventilation flow supply air
level 3
Electricity (page
)
Connections
Main voltage
Fuses property
Earth circuit-breaker
NIBE GV-HR 120-400