Lift from the street to the set up location
If the base allows, the simplest thing is to use a pallet
truck to move the F2120 to the set up location.
NOTE
The centre of gravity is offset to one side (see
print on the packaging).
L
E
K
C:a 180 kg
Approx. 180 kg
If F2120 needs to be transported across soft ground,
such as a lawn, we recommend that a crane is used
that can lift the unit to the installation location. When
F2120 is lifted with a crane, the packaging must be
undisturbed, see the illustration above.
If a crane vehicle cannot be used the F2120 can be
transported on an extended sack truck. F2120 must be
taken from its heaviest side and two people are re-
quired to lift F2120.
Lift from the pallet to final positioning
Before lifting remove the packaging and the securing
strap to the pallet.
Place lifting straps around each machine foot. Lifting
from the pallet to the base requires four persons, one
for each lifting strap.
Scrapping
When scrapping, the product is removed in reverse
order. Lift by the bottom panel instead of a pallet!
11
Chapter 2 |
Delivery and handling
NIBE™ F2120
Summary of Contents for F2120-12
Page 1: ...Installer manual LEK NIBE F2120 8 12 16 20 Air water heat pump IHB GB 1621 1 331385...
Page 2: ......
Page 15: ...Removing the side cover LEK 15 Chapter 2 Delivery and handling NIBE F2120...
Page 55: ...Electrical circuit diagram 1x230V 55 Chapter 10 Technical data NIBE F2120...
Page 56: ...NIBE F2120 Chapter 10 Technical data 56...
Page 57: ...57 Chapter 10 Technical data NIBE F2120...
Page 58: ...NIBE F2120 Chapter 10 Technical data 58...
Page 59: ...3x400V 59 Chapter 10 Technical data NIBE F2120...
Page 60: ...NIBE F2120 Chapter 10 Technical data 60...
Page 61: ...61 Chapter 10 Technical data NIBE F2120...
Page 62: ...NIBE F2120 Chapter 10 Technical data 62...
Page 64: ......
Page 65: ......
Page 66: ......
Page 67: ......