Cable routing
The following image shows recommended cable rout-
ing from the distribution box to the condensation water
trough on the inside of F2120. Transition between the
electrical cable and the heating cable must occur after
the lead-in to the condensation water trough. The
distance between the distribution box and the lead-in
to the condensation water trough is approx. 1,600 mm.
LEK
LE
K
Data
Serie.nr
.
Art.nr
. 711
453
OUT
IN
EB14
LEK
LE
K
Data
Serie.nr
.
Art.nr
. 711
453
OUT
IN
EB14
NIBE™ F2120
Chapter 5 |
Electrical connections
28
Summary of Contents for F2120-12
Page 1: ...Installer manual LEK NIBE F2120 8 12 16 20 Air water heat pump IHB GB 1621 1 331385...
Page 2: ......
Page 15: ...Removing the side cover LEK 15 Chapter 2 Delivery and handling NIBE F2120...
Page 55: ...Electrical circuit diagram 1x230V 55 Chapter 10 Technical data NIBE F2120...
Page 56: ...NIBE F2120 Chapter 10 Technical data 56...
Page 57: ...57 Chapter 10 Technical data NIBE F2120...
Page 58: ...NIBE F2120 Chapter 10 Technical data 58...
Page 59: ...3x400V 59 Chapter 10 Technical data NIBE F2120...
Page 60: ...NIBE F2120 Chapter 10 Technical data 60...
Page 61: ...61 Chapter 10 Technical data NIBE F2120...
Page 62: ...NIBE F2120 Chapter 10 Technical data 62...
Page 64: ......
Page 65: ......
Page 66: ......
Page 67: ......