Docking
General
F2015 can be installed in several different ways. The requisite
safety equipment must be installed in accordance with cur-
rent regulations for all docked options.
See www.nibe.eu for more docking options.
When docking with F2015, a total water volume, in the
boiler and accumulator, of at least 20 litres boiler water per
kW output on the heat pump is recommended.
Abbreviations
Shut-off valve
AV
Circulation pump
CP1
Included in SMO 10
Temperature sensor, flow pipe
FG1
Auxiliary relay
HR
Charge pump
LP
Included in SMO 10
Return temperature sensor
RG1
Control valve
RV
Included in F2015
Particle filter
SF
Shunt valve
SV
Safety valve
SÄV
Drain valve
TV
Outside sensor
UG
Heating thermostat
VT
Hot water sensor
VVG
F2015 docked with VVM 300 (fixed condensing)
FIGHTER 2020
VVM 300
AV
AV
SÄV
SF
RC
TV
UG
)
990
F2015 -6, -8 and -11 can be connected to VVM 300. F2015
is controlled by VVM 300. F2015 works with floating con-
densing against the heating system and prioritises hot water
charging in VVM 300.
If F2015 cannot meet the heating requirement, additional
heat is shunted in from VVM 300. If the outdoor temperat-
ure drops below the set stop temperature, VVM 300 en-
gages and takes over heating.
NOTE
To prevent interference, sensor cables and communic-
ation cables must be separated (min 20 cm) from high
voltage cables when cable routing.
7
F2015
For the Installer
Docking
Summary of Contents for F2015
Page 1: ...INSTALLATION AND MAINTENANCE INSTRUCTIONS MOS GB 1008 3 F2015 031239 F2015 LEK ...
Page 2: ......
Page 27: ...Electrical circuit diagram 1x230V 6 11 kW 25 F2015 Miscellaneous Electrical circuit diagram ...
Page 28: ...F2015 26 Miscellaneous Electrical circuit diagram ...
Page 29: ...27 F2015 Miscellaneous Electrical circuit diagram ...
Page 30: ...F2015 28 Miscellaneous Electrical circuit diagram ...
Page 40: ...F2015 38 ...
Page 41: ...39 F2015 ...
Page 42: ...F2015 40 ...
Page 43: ......