background image

GB

12

EU Declaration of Conformity

Manufacturer

NIBE AB / Contura

Address

Box 134, Skulptörvägen 10
285 23 Markaryd, Sweden

E-Mail

[email protected]

Website

www.contura.eu

Telephone

+46 433 275100

THIS DECLARATION OF CONFORMITY IS ISSUED UNDER OUR SOLE RESPONSIBILITY FOR THE FOLLOWING PRODUCT:

Trade name

Contura i2

Identification of product 

www.contura.eu

THE OBJECT OF THE DECLARATION DESCRIBED ABOVE IS IN CONFORMITY WITH -
THE RELEVANT UNION HARMONIZATION LEGISLATION:

THE RELEVANT HARMONIZED STANDARDS:

DIR 2009/125/EC

EN 13229:2001/A2:2004/AC:2007

REG (EU) 2015/1185

CEN/TS 15883:2010

REG (EU) 2015/1186
REG (EU) 2017/1369
REG (EU) 305/2011

TECHNICAL DOCUMENTATION

Indirect heating functionality: 

No

Direct heat output:

5,0 kW

Energy Efficiency Index (EEI):

106,4

Test report

KIWA UK 61354, NB 0692

CHARACTERISTICS WHEN OPERATING WITH THE PREFERRED FUEL
ITEM

SYMBOL

VALUE

UNIT

ITEM

SYMBOL

VALUE

UNIT

HEAT OUTPUT

USEFUL EFFICIENCY, BASED ON NET CALORIFIC VALUE (NCV )

Nominal heat output:

P

nom

5,0

kW

Useful efficiency at nominal 
heat output

η  

th,nom

80,3

%

AUXILIARY ELECTRICITY CONSUMPTION

TYPE OF HEAT OUTPUT/ROOM TEMPERATURE CONTROL

At nominal heat output

el

max

-

kW

Single stage heat output, no room temperature control

Yes

At minimum heat output

el

min

-

kW

Two or more manual stages, no room temperature control

No

In standby mode

el

SB

-

kW

With mechanic thermostat room temperature control

No

With electronic room temperature control

No

With electronic room temperature control plus day timer

No

With electronic room temperature control plus week timer

No

OTHER CONTROL OPTIONS

Room temperature control, with presence detection

No

Room temperature control, with open window detection

No

With distance control option

Specific precautions for assembly, 
installation, or maintenance.

Fire protection and safety distances to combustible building materials must be observed under all circumstances.
A sufficient supply of combustion air must always be guaranteed. Air suction systems can interfere with the combustion 
air supply.

FUEL

PREFERRED 

FUEL  

OTHER SUITABLE 

FUEL

η

S

   (%)

EMISSIONS AT NOMINAL HEAT OUTPUT

PM

OGC

CO

NO

x

mg/ Nm

3

 (13% O

2

)

Wood logs with moisture content ≤25%

Yes

No

70,3

<40

<120

<1500

<200

Compressed wood with moisture content <12%

No

Yes

70,3

<40

<120

<1500

<200

Other woody biomass

No

No

Non-wood biomass

No

No

Anthracite and dry steam coal

No

No

Hard coke

No

No

Low temperature coke

No

No

Bituminous coal

No

No

Lignite briquettes

No

No

Peat briquettes

No

No

Blended fossil fuel briquettes

No

No

Other fossil fuel

No

No

Blended biomass and fossil fuel briquettes

No

No

Other blend of biomass and solid fuel

No

No

The undersigned is responsible for the manufacture and conformity with the declared performance.

Niklas Gunnarsson,

 Business area manager NIBE STOVES

Markaryd, April 1, 2022

Summary of Contents for Contura Ci2

Page 1: ...Ci2 Ci2G contura eu ...

Page 2: ...30 Montage 32 Fakta 3 Prestandadeklaration 4 EU försäkran om överrensstämmelse 5 Måttskiss 6 Inbyggnadsexempel 8 Montering 32 Fakta 18 Ytelseserklæring 19 EU samsvarserklæring 20 Målskisse 21 Innbyggingseksempel 23 Montering 32 Facts 10 Declaration of performance 11 EU Declaration of Confirmit 12 Dimensions diagram 13 Recess example 15 Assembly 32 ...

Page 3: ...ed Also read the Lighting instructions before lighting for the first time The insert becomes very hot During operation certain surfaces of the insert become very hot and can cause burn injury if touched Be aware of the strong heat radiated through the hatch glass Placing flammable material closer than the safe distance indicated may cause a fire Pyre lighting can cause quick gas ignition with the ...

Page 4: ...assification A1 Minimum distance to flammable materials Rear 200 mm Side 250 mm Ceiling 1200 mm Ceiling 700 mm front grate Front 1400 mm Floor 275 mm Fire hazard due to burning fuel falling out Pass EN 13229 2001 A2 2004 AC 2007 Cleanability Pass Emissions from combustion CO 1500 mg Nm3 13 O2 Surface temperatures Pass Temperature on the handle Pass Mechanical resistance Pass Temperature in the spa...

Page 5: ...ture control No In standby mode elSB kW With mechanic thermostat room temperature control No With electronic room temperature control No With electronic room temperature control plus day timer No With electronic room temperature control plus week timer No OTHER CONTROL OPTIONS Room temperature control with presence detection No Room temperature control with open window detection No With distance c...

Page 6: ...ements must be at least 1 4 metre from the front of the insert door When connecting to a steel chimney the requirements for safe distance to the chimney must also be observed A clearance of at least 300 mm must be allowed as a safe distance between an uninsulated flue pipe and com bustible building elements Dimensions diagram 3 sided frame 4 sided frame ...

Page 7: ...nce must stand on a constructional hearth which meet the building regulations and has minimum dimension as shown in the diagram Always check that the building has enough bearing capacity for the heart stove and chimney The stove can be loaded with maximum 100 kg of chimney ...

Page 8: ...t to the ceiling The recess must be sealed off above the convection exhaust The seal must be 100 mm above the convection exhaust s upper edge and must be made of 40 mm non flammable material according to the material requirements above Use heat resistant silicone for example between the seal and chimney Convection air The convection air ventilates the surround cools the insert and carries hot air ...

Page 9: ...t be a 20 mm air space between the building board and the combustible wall The air space must allow air to flow freely along the lower and upper edges see diagram to the right Diagram of aerated wall Two calcium silicate board battens ensure that the air space is maintained Firewall approved and fully complies with safety requirements according to the authorised inspection body Examples of approve...

Page 10: ...Air gap 550 40 30 275 1100 100 Area in min 300 cm2 Load bearing base Area out min 200 cm2 Combustible wall 700 min 100 20 40 40 55 100 275 1100 Area out min 200 cm2 Area in min 300 cm2 Heat shield Load bearing base 20 mm Air gap max 100 Ci2 Recess example Always observe the safety distances to combustible material required by a steel flue The dimensions are the minimum dimensions unless otherwise ...

Page 11: ...port 2 Fire bricks Vermiculite 3 Type plate 4 Grate 5 Ash pan 6 Hearth base 7 Serial number Før montering Montage Hvis innsatsen må legges ned for å flyttes bør løse deler demonteres Demontering av brennplater og hvelv er beskrevet på neste side 1 Stussplate 2 Brennplater og hvelv Vermikulitt 3 Typeskilt 4 Rist 5 Askeskuff 6 Ildstedsbunn 7 Serienummer Les éléments non fixés devront être déposés si...

Page 12: ...33 1 2 3 5 6 7 4 Handle with care ...

Page 13: ...eas This when burning wood logs and operated in accordance with these instructions and when fitted with a permanent stop to prevent closure of the air control unit beyond 31 open position Mandatory for smoke control areas The permanent stop must be installed if the appliance is to be used in a smoke control area this stop must not be removed in smoke control areas otherwise an offence will be comm...

Page 14: ...35 8 9 10 ...

Page 15: ...36 11 12 ...

Page 16: ...ara minst 10 mm luftspalt detta pga insatsens värmeutvidgning The insert is designed to be installed as a stove cassette in existing approved open hearths There must be an 10 mm air gap around the insert to allow for the expansion of the insert when hot L insert peut être installé comme une cassette dans un foyer ouvert existant et homologué Un espace d au moins 10 mm doit être prévu autour de l i...

Page 17: ...38 Accessory Tilbehør Accessoire Tillbehör GB NO FR SE 1 2 3 ...

Page 18: ...nnsatsen kan også kobles til med faste rør som føres opp i skorsteinen Raccordement à une cheminée de maçonnerie existante Pour simplifier le montage il est recommandé d utiliser un tuyau flexible proposé en option Fixez le manchon dans le tuyau Raccordez et scellez entre le tuyau et la cheminé selon les instructions séparées L insert peut également être raccordé avec des conduits fixes dans la ch...

Page 19: ...40 3 4 ...

Page 20: ...41 x4 5 x4 6 ...

Page 21: ...42 7 mm 7 8 ...

Page 22: ...43 9 10 ...

Page 23: ...44 11 12 ...

Page 24: ... de invändiga delarna i omvänd ordning Reinstall the internal components in reverse order Sett de innvendige delene tilbake på plass i motsatt rekkefølge Remontez les éléments intérieurs dans l ordre inverse SE GB NO FR ...

Page 25: ......

Page 26: ......

Page 27: ......

Page 28: ...811483 IAV SE EX Ci2 2 2022 05 24 NIBE AB Box 134 285 23 Markaryd Sweden contura eu ...

Reviews: