S. INSTALLATION CHECK LIST AND JOB SITE SHEET
S. INSTALLATION CHECK LIST AND JOB SITE SHEET
Amperage and Power Measurements :
24VAC Low Voltage Measurements :
Commercial Job Site Information
Site Information and Application Details:
State :
Zip :
Mobile :
State :
Zip :
Mobile :
Model Number :
(Please include all letters and digits of the model number)
Serial Number :
(Please include all letters and digits of the serial number)
Date of Install :
(When was the unit installed, month, day, and year)
Unit Setup and Operational Information
Base Voltage : 208 240 460
Phase :
1 3
(Circle one)
(Circle one)
Transformer Tap : 208 240 460
(Circle one)
Measured Line Voltage :
Phase A to B :
Phase B to C :
Phase C to A :
R to C :
24VAC Measured Voltage :
Full Running Load
Phase A :
Phase B :
Phase C :
Blower
Compressor 1
Compressor 2
Transformer Load:
24VAC Measured Amp Load :
T-stat Load:
Outdoor Fans
Voltage and Amperage Information :
Line Voltage Measurements :
Business Name :
Address :
City :
Site Contact :
Phone :
Email :
Dealer/Contractor Information:
Business Name :
Address :
City :
Site Contact :
Phone :
Email :
Distributor and Support Details:
Distributor Name :
City :
State :
Technician Name :
Visit Date:
Technician Name :
Visit Date:
Technician Name :
Visit Date:
Rep Name :
Visit Date:
Phase A to Ground :
Phase B to Ground :
Phase C to Ground :
Conductor Size:
Breaker Size :
Pressure (PSI) :
Temperature (
¡
F) :
Superheat (
¡
F) :
Outdoor Air Temperature (
¡
F) :
Circuit 2 :
Suction Line
Liquid Line
Pressure (PSI) :
Temperature (
¡
F) :
Sub-cooling (
¡
F) :
Pressure (PSI) :
Temperature (
¡
F) :
Sub-cooling (
¡
F) :
Refrigerant Circuit Information :
Circuit 1 :
Suction Line
Liquid Line
Pressure (PSI) :
Temperature (
¡
F) :
Sub-cooling (
¡
F) :
Outdoor Air Wet Bulb (
¡
F) :
Return Air Temperature (
¡
F) :
Return Air Wet Bulb (
¡
F) :
Supply Air Temperature (
¡
F) :
Supply Air Wet Bulb (
¡
F) :
15
7
Summary of Contents for Climate Master RGED Series
Page 2: ...2 62 ...
Page 88: ...88 P APPENDICES Appendix C Air Flow Performance Data ...
Page 90: ...90 P APPENDICES Appendix C Air Flow Performance Data Cont ...
Page 92: ...92 P APPENDICES Appendix C Air Flow Performance Data Cont ...
Page 94: ...94 P APPENDICES Appendix C Air Flow Performance Data Cont ...
Page 159: ...159 ...