6
HK 200S
HK 200S-6
2 Supply and operation
Transport
Assembly
HK 200S / HK 200S-6 heat pump must be transported
and stored vertically in a dry place. HK 200S / HK 200S-6
can be, however, carefully placed on the rear side of the
casing when carrying the device into the building.
Leave 800 mm free space at the front of the heat pump.
All maintenance works on HK 200S / HK 200S-6 can be
done from the front.
Side covers are installed for permanent, therefore,
they cannot be disassembled.
•
HK 200S / HK 200S-6 must be set on a solid wa-
terproof base that would keep the weight of the
indoor unit. The regulated legs of the heat pump
allow for levelling and stable setting of the device.
•
Because HK 200S / HK 200S-6 is equipped with
condensate drain, indoor unit installation site
must be furnished with a fl oor drain with a dis-
charge to the sewer system.
1. Remove screws at the bottom edge of the front
cover.
2. Tilt the cover at the bottom edge and lift.
Installation site
IMPORTANT
Leave 10 – 25 mm free space between the indoor
module and the back wall for cables and piping.
800 mm
Removal of the covers
1
2
Chapter 2 |
Supply and operation
20-40 mm
Included items
Safety valve
with pressure gauge
Wrench size 13