![NIBE-BIAWAR HK 200S Installation And Operating Manual Download Page 5](http://html1.mh-extra.com/html/nibe-biawar/hk-200s/hk-200s_installation-and-operating-manual_1686586005.webp)
5
HK 200S
HK 200S-6
Description
Notes
Signature
Date
Heating medium
Installation rinsing
Installation venting
Diaphragm expansion vessel
Particulate filter
Safety valve
Cut-off valves
Pressure in the heating system
Connection according to the drawing
Hot water
Cut-off valves
Mixing valve
Safety valve
Power supply
Communication connection
Circuit fuses
Fuses, internal module
Building fuses
Temperature sensor outdoor
Room sensor
Energy meter
Emergency switch
Switch differential
Thermostat emergency mode setting
Miscellaneous
Connected to
Installation acceptance
The heating system must be accepted before start-up. Acceptance must be done by a person with appropriate
qualifications. Complete the card in the operating manual by entering the installation data.
CHECKLIST
Chapter 1 |
Important information