background image

17

Configuration

When configuring an ATyS C55/65 it is recommended to have both Source 1 and Source 2 available to ensure 
settings match the required application. 

NHP CIP Factory Settings

Language

English

Poles & Wires 

3P+N

Nominal Voltage 

415 V

Nominal Frequency 

50 Hz

Phase Rotation

Application Type 

MAIN 

GEN

Source Priority

Source 1

Switch Technology

Circuit Breaker 

(Custom)

Tripping Action

Total Inhibition

Date Format

DD/MM/YY

Date and Time

AEDT

Modbus Settings

Baud: 38400
Stop: 1 BIT
Parity: None
Address: 006

When purchasing a C55 or C65 outside of the 
ATYSCxxCIPxxxx offerings you will be promoted with the 
SMART Wizard configuration on first power up. As the 
ATYSCxxCIPxxxx is tested in house at NHP manufacturing 
prior to despatch this Wizard would have been preformed 
and set to: 

Navigate to the Wizard

Press the Back/Menu button

1.

2.

3.

4.

5.

6.

Or

Navigate to Parameters Menu  

Press OK button to enter Parameters

Or

Navigate to Wizard Menu (

Last option

)

Enter the 1000 using the arrows and press OK button to confirm

Press OK button to enter Wizard

Time settings do not change with daylight savings and will need to 

be kept up-to-date by the end user

NHP Custom Switch Technology Settings

Input 1

BREAKER 1 CLOSED (N/O)

Input 2

BREAKER 2 CLOSED (N/O)

Input 3

BREAKER 1 TRIPPED (N/O)

Input 4

BREAKER 2 TRIPPED (N/O)

If you would like another configuration follow the 

below to get to the SMART Wizard.

Images are taken from Socomec C55/65 Manual for interface reference and don’t reflect the NHP factory settings

Input 3 and 4 must to be set in I/O settings and can’t be set via Wizard or Switch Technology Settings

Summary of Contents for ATYSC CIPACB Series

Page 1: ...cations ATYSC55CIPACB ATyS C55 Transfer Switch Control Interface for NHP AR ACBs ATYSC65CIPACB ATyS C65 Transfer Switch Control Interface for NHP AR ACBs ACBs must contain the following Trip Unit AGR2...

Page 2: ...oduct must always be installed and commissioned by qualified and approved personnel Maintenance and servicing operations should be performed by trained and authorized personnel Do not handle any contr...

Page 3: ...0 Looms are prewired to CIP and controller plugs Not Supplied 16090001 X 1 16090001 ATYSC65CIPACB x 1 C65 16000065 3 Items x 2 and ACBs with interlocks mech installed on bodies Carriage Interlock Mech...

Page 4: ...4 Dimensions Control Interface Panel ATyS C55 65 Controller Dimensions not to scale 63 90 mm 48 10 mm 160 mm 240 mm 220 mm 180 mm...

Page 5: ...ct Clip the mounting feet in the designated slot Remove all connectors then place the ATS controller inside the door cut out and clip the door mounting screws into the side of the controller 2 screws...

Page 6: ...able must be more than 10mm away from the RTC battery cover and USB Do not drill holes above the controller after it has been mounted to avoid swarf in terminals Controller 50 mm 50 mm 50 mm Recommend...

Page 7: ...able end with 6mm grub screw adjustment nuts and washers and 1 xallen key 4 x M6 20mm mounting studs comes with 4 x M6 nuts and 8 x spring washers 2 x M6 12mm flat and spring washer attached fixing bo...

Page 8: ...core length should be at least 90mm longer than black outer sheath total length after the loose brass adjustment end is fitted 6 Insert the grub screw with fingers until the screw meet the black outer...

Page 9: ...NOTE The best tool for clipping steel inner cable are the cutters found on the back of quality combination pliers 9 With the ACB bodies removed from the carriages as described in step 3 screw in only...

Page 10: ...o ACB 1 port D adjust the top and bottom cable fixing nuts up until it clamps the cable end to the support see left It is important that the top cable fixing nut is near its maximum end Keep finger ti...

Page 11: ...elow Tighten the 2 x M6 20mm mounting studs until secure from the inside of the ACB carriage with a 10mm spanner Secure the mechanical interlock mechanism to the mounting studs with spring washer and...

Page 12: ...TMENT AND TEST PROCEDURE MUST BE CONDUCTED ON A DE ENERGISED SWITCHBOARD The trip bar has a maximum angular rotation of 20 24 degrees see below and this can be moved by pressing down on the pivot poin...

Page 13: ...r play is removed 5 With the play now removed try to insert but do not force jig 2 in between the trip bar and the trip bar lever of ACB 1 as shown below Because the play has been removed it should no...

Page 14: ...r and the trip bar lever has not increased should be 0 5 1 0mm of play If required adjust ACB 1 port A fixing nuts to shorten the inner core length and re secure as per step 7 Repeat steps 9 to 12 thr...

Page 15: ...snap snap Looms A B C will be prewired to their required plugs on the Controller Match the plugs with there sockets on the Controller Wiring to Controller COMPLETE C65 Only use when current sensing i...

Page 16: ...p N 2p N 3p N 2p N 2p N 2p N 3p N 2p N 2p 3p 3p 1p N 3p N 3p N 1p N 2p N 2p N 2p N 3p N 2p N 2p 3p 3p Do not input 264 VAC line neutral nominal voltage to the Fuse Terminals The C55 65 sensing termina...

Page 17: ...NHP manufacturing prior to despatch this Wizard would have been preformed and set to Navigate to the Wizard Press the Back Menu button 1 2 3 4 5 6 Or Navigate to Parameters Menu Press OK button to ent...

Page 18: ...with BTS and ACBs the Switch Technology should be set to Circuit Breaker 5 Modbus RTU communications as standard if not using communications proceed with the OK button If the ATyS is still not recogn...

Page 19: ...5 Enter the 1000 using the arrows and press OK button to confirm Confirm that you wish to preform a TON A TON will start by sending a start gen signal to the secondary source if in Main Gen and will i...

Page 20: ...operating mode the controller will return to after the trip signal has been disabled input has returned to inactive CHRG TIME STATUS DISABLED WHEN OPEN WHEN CLOSED Allows users to configure a charging...

Page 21: ...ip event has been reset No additional recommendation required Power loss to OCRs and Controller after a trip event Tripping Inhibition can reset leaving the controller in its previous mode auto manual...

Page 22: ...22 ATYSC55CIPACB ATYSC65CIPACB Wiring For AGR21 and AGR31 ACBs Spare cores will be available in future updates E...

Page 23: ...23 ATYSC55CIPACB ATYSC65CIPACB Wiring For Non Auto AR ACBs Spare cores will be available in future updates E...

Page 24: ...24 Legend 16...

Page 25: ...ock Blocked Emergency Sign Inhibit S1 Inhibit S2 Inhibition Partial Inhibition Total Inhibition Fault Present Check Faults in Log Fault Log In Progress Possible Faults Unexpected Transfer Failed to Tr...