6
Step 3:
Place the other Installation Bracket into the
Ceiling Cutout, align the two together, and fasten
them to each other using (2) 10-32 x 9/16” FHMS
Step 4:
Center the now assembled Installation Bracket
within the Ceiling Cutout and fasten it to the Trusses
or Framing using (32) #10 x 1” THWS.
Note:
Alternate screws may be used in place of
the provided #10 x 1” THWS if approved by the
Contractor/Installer.
Step 6:
Run all of your
necessary cables/outlets
to the Ceiling Cutout.