16
PARTS:
• • 2 x M8 16mm Bolts
• • 2 x M8 Washers
• • 1 x Small Pedal Plate
18
A) Align the Small Pedal Plate with the T-Nuts previously installed in STEP 15a.
B) Bolt through and secure using M8 Bolts and Washers.
Video Instruction: bit.ly/nlrbuild
17
PARTS:
• • NIL
19
Loosen the bolts on the Pedal Plates. Adjust to your desired position using the alignment lines and tighten Bolts to lock in the
Pedal Plates.
PARTS:
• • 2 x M8 16mm Bolts
• • 2 x M8 Washers
21
Position the pedal assembly to your desired angle and install 1 x M8 Bolts and Washers to Pedal
Adjustment Fins to lock in the pedal assembly at desire angle. Repeat on other side.
PARTS:
• • 4 x M8 16mm Bolts
• • 4 x M8 Washers
20
Align the holes on the Pedal Adjustment Fins with the T-Nuts previously installed in STEP 01B & STEP
15a. Bolt through and secure using 2 x M8 Bolts and Washers. Repeat on the other side.
Note:
Use line laser lines for
easy alignment.
Repeat
on Other
Side
Repeat
on Other
Side
PARTS:
• • 4 x M8 16mm Bolts
• • 4 x M8 Washers
• • 1 x Large Pedal Plate
17
A) Align the Large Pedal Plate with the T-Nuts previously installed in STEP 15a.
B) Bolt through and secure with M8 Bolts and Washers.
Note:
Do not tighten the
pedal bracket until you have
your desired position.
Repeat
on Other
Side
PARTS:
• • 2 x M8 20mm Bolts
• • 2 x M8 Washers
16b
Align the holes on the Upright Connection Plate with the T-Nuts previously installed in STEP 16a. Bolt through and secure with
M8 Bolts and Washers. Repeat on the other side.
Repeat
on Other
Side
PEDAL ADJUSTMENT RANGE
PEDAL ANGLE ADJUSTMENT
Repeat
on Other
Side
A
)
B
)
A
)
B
)
ALTERNATE PEDAL INSTALLATION
(
FOR SHORTER USERS
)