GEO
S12
EN54
HARDWARE
SETUP
PROCEDURE
Page
30
/
53
System Manual GEOS12 EN54
7.3.7
GEO S12 EN54 horizontal array cable mounted on a ceiling
Required items
-
2 x VNI-ABRK (allows cable suspension for horizontal arrays, holes for cable suspension are 10mm diameter)
-
(N-1) x GPI-ANPL for a N x GEO S12 EN54 array (ANPL1 ranges from 0.2° to 3.15°, ANPL2 ranges from 5° to 10°, ANPL3
ranges from 16° to 30°)
-
4 x slings and 4 shackles (
not provided
)
IMPORTANT
Ensure that the ceiling is strong enough to hold 4 times GEO S12 EN54 cluster weight and that that the
cables suspension system required to fix the cluster under the ceiling is properly dimensioned.
Procedure
-
Proceed as in above section, VNI-LBRK being positioned on the outer cabinets instead of VNI-ABRK
-
4
slings and 4 shackles (not provided) are required to secure the cluster under the ceiling
Summary of Contents for GEO S12 EN54 Series
Page 34: ...TECHNICAL SPECIFICATIONS Page 34 53 System Manual GEOS12 EN54 9 1 2 Dimensions mm inches ...
Page 36: ...TECHNICAL SPECIFICATIONS Page 36 53 System Manual GEOS12 EN54 9 2 2 Dimensions mm inches ...
Page 38: ...TECHNICAL SPECIFICATIONS Page 38 53 System Manual GEOS12 EN54 9 3 2 Dimensions mm inches ...
Page 40: ...TECHNICAL SPECIFICATIONS Page 40 53 System Manual GEOS12 EN54 9 4 2 Dimensions mm inches ...
Page 52: ...USER NOTES System Manual GEOS12 EN54 Page 52 53 11 USER NOTES ...