background image

 

Start Up Guide 

 

 

 

1.4 

  Unpacking and Handling 

It is recommended that the Models 1936-R/2936-R Series Optical Power 
Meters be unpacked in a lab environment or work site.  Unpack the system 
carefully; small parts and cables are included with the instrument.  Inspect the 
box carefully for loose parts before disposing of the packaging.  You are 
urged to save the packaging material in case you need to ship your equipment 
in the future. 

1.5 

  Inspection for Damage 

The Models 1936-R/2936-R Series Optical Power Meters are carefully 
packaged at the factory to minimize the possibility of damage during 
shipping.  Inspect the box for external signs of damage or mishandling.  
Inspect the contents for damage.  If there is visible damage to the instrument 
upon receipt, inform the shipping company and Newport Corporation 
immediately. 

 

WARNING 

Do not attempt to operate this equipment if there is evidence of 
shipping damage or you suspect the unit is damaged.  Damaged 
equipment may present additional hazards to you.  Contact 
Newport technical support for advice before attempting to plug 
in and operate damaged equipment. 

 

1.6 

  Parts List 

The following is a list of parts included with the 1936-R/2936-R Series 
Optical Power Meters: 

1.

 

User’s Manual (softcopy in CD) 

2.

 

Start-up Guide (Hardcopy) 

3.

 

Software Drivers and Utilities (CD) 

4.

 

Power cord 

5.

 

Two fuses 

If you are missing any hardware or have questions about the hardware you 
have received, please contact Newport Corporation. 

1.7 

  Choosing and Preparing a Suitable Work Surface 

The Models 1936-R/2936-R Series Optical Power Meters may be placed on 
any reasonably firm table or bench during operation.  The front legs of the 
unit can be pulled out to tilt the unit at an angle, if desired.  

Summary of Contents for 1936-R series

Page 1: ...Single and Dual Channel Optical Meters Start Up Guide Model 1936 R 2936 R Series...

Page 2: ......

Page 3: ...formation regarding the use and operation of the power meter is included in the complete User s Manual The complete User s Manual in Adobe PDF format and the instrument software drivers are included o...

Page 4: ...This page intentionally left blank...

Page 5: ...tion has the potential to cause damage to property or equipment ELECTRICAL SHOCK Hazard arising from dangerous voltage Any mishandling could result in irreparable damage to the equipment and personal...

Page 6: ...Warning Label If this equipment is used in a manner not specified in this manual the protection provided by this equipment may be impaired To prevent damage to equipment when replacing fuses locate an...

Page 7: ...rm the shipping company and Newport Corporation immediately WARNING Do not attempt to operate this equipment if there is evidence of shipping damage or you suspect the unit is damaged Damaged equipmen...

Page 8: ...h the rear panel input power connector that provides in line transient protection and RF filtering The input power connector contains the fuses and the switch to select series or parallel connection o...

Page 9: ...eing used for measurements 2 2 Front Panel Keys The front panel keys are organized in three groups see Figure 2 Navigation Keys Reconfigurable also called Soft Keys Escape ESC Key Besides these keys t...

Page 10: ...t 2 3 1 Elements That Vary by Model on back panel Single channel power meters have the processing electronics installed on CH A while dual channel power meters have both CH A and CH B installed Input...

Page 11: ...ar metal shell connector Markings on the rear panel identify electrical requirements for the Optical Power Meter and potential hazards associated with using it NOTE For the listed optional connectors...

Page 12: ...36 R Series 3 Using a small screwdriver insert and press down into the notch at the top of the power entry module to pry the door open 4 Carefully remove the voltage selector drum 5 Rotate the voltage...

Page 13: ...t you to restart once the upgrade is successful Restart the power meter by turning it OFF and back ON The power meter will restart running the new firmware Press the SETUP ENTER key and then Softkeys...

Page 14: ...10 Start Up Guide This page is intentionally left blank...

Page 15: ...y re certification To obtain information regarding factory service contact Newport Corporation s Service Department or your Newport representative Please have the following information available Instr...

Page 16: ...53 Aidu Road Bld 3 Flr 3 Sec C Shanghai 200131 China Telephone 86 21 5046 2300 Fax 86 21 5046 2323 Return Procedure If there are any defects in material or workmanship or a failure to meet specificati...

Page 17: ......

Page 18: ...Visit Newport Online at www newport com Newport Corporation Worldwide Headquarters 1791 Deere Avenue Irvine CA 92606 In U S 800 222 6440 Tel 949 863 3144 Fax 949 253 1680 Internet sales newport com...

Reviews: