1.1 PRODUCT DESCRIPTION & 

INTENDED USE

Thank you for choosing a NewMotion Electric Vehicle 
(EV) Charge Point.

This charge point is intended to charge the batteries 
within EVs compatible with IEC-61851 MODE3 definition 
and requirements. Dedicated EV specific plugs will 
need to be utilised. No adaptors, conversion adaptors 
or extension sets for cables are allowed to be used. EVs 
and cables used with this charge point should always be 
undamaged and in their original state. 

1.2 SAFETY W CAUTION!

The electrical system must be voltage-free during the 
entire installation procedure. Failing to do so can lead to 
serious injury or even death. The installation procedure 
must be carried out by a trained electrician who works in 
accordance with all relevant local laws and regulations.
Do not install in potentially explosive atmospheres and/
or zones with high electromagnetic radiation and/or in 
flood-prone areas. 

The charge point is connected to the electricity grid 
and even if the equipment is switched off, hazardous 
voltages may be present at the input terminals. Always 
switch off the AC supply before starting any work on 
the charge point and/or its installation. Do not carry out 
any work in rainy conditions or when the humidity is 
above 95%. The safety guidelines are intended to ensure 
correct installation and usage. Any failure to comply with 
the valid safety guidelines or instructions provided in this 
manual may result in fire, electrocution or severe injury.

The charge point is a product in Safety Class I and 
is supplied with an earth terminal for protection 
purposes. The AC input clamps must be fitted with an 
uninterruptible earth for protection purposes. Ensure 
that the connection cables are fitted with fuses and 
circuit breakers. Never replace a protection component 
with another type. First check the full installation to 
determine if that component can be used with the 
existing installation components.

Before you switch on the charge point, check that 
the available power source matches the configuration 
settings of the product, as described in this manual.

Tripping of the RCD could be caused by an earth fault 
or a defect relay. If, after resetting the RCD, the device 
cannot be activated or immediately trips again; please 
contact your installer.

1.3 LEGAL DISCLAIMER

This manual is created for you with care.  
We however do not guarantee that all information is 
complete, accurate and correct. 

If you find any unclarities or mistakes in this installation
manual, or if you have any feedback or suggestions in
general about this manual, please inform us at
[email protected] and 
mention the document version in the subject.

Please check the website 

go.newmotion.com/renaultinstallation

 

for the latest version of this manual.

NewMotion strongly advises to have the product 
installed by EV-Ready certified professionals. How 
the product should be installed and used depends on 
local circumstances and local and national regulation, 
which are not mentioned in our manual. NewMotion 
is not responsible for any loss or damage whatsoever 
caused – including without limitation, any indirect, 
personal or consequential loss or damage – arising 
from or in connection with the use of this manual. Nor 
does NewMotion accept any liability for any such loss or 
damage arising out of your reliance on any information 
contained in this manual.

1. INTRODUCTION

Summary of Contents for Home Advanced Edition 7

Page 1: ...100 cm Home Basic Edition 7 Home Basic Edition 11 VERSION 06A0RNM20ENG05 2020 INSTRUCTION MANUAL EN...

Page 2: ......

Page 3: ...arth terminal for protection purposes The AC input clamps must be fitted with an uninterruptible earth for protection purposes Ensure that the connection cables are fitted with fuses and circuit break...

Page 4: ...is not connected to a back office No online services or remote support are available for this charge point In case of an error or issue on site support is needed from a ZE Ready certified installer Y...

Page 5: ...ule only for 11 kW model Cable mount clips For EV and ZE Ready installation Cable 5 x 1 5mm2 minimum for shunt and ON OFF peak accessories For EV Ready installation Shunt options ABB S2C A2 in combina...

Page 6: ...protection class Certificates User interface Identification start charging Configuration Backoffice protocol Stand by consumption 06A _ _ _ _ _ _ 06B _ _ _ _ _ _ Home Basic Edition 7 single phase 32A...

Page 7: ...lled outdoors with a road proximity less then 5 meters 3 2 TECHNICAL SPECIFICATIONS CONTINUED 3 PRODUCT OVERVIEW P1 DONGLE SPECIFICATIONS 11 KW MODEL ONLY Operating temperature range Operating humidit...

Page 8: ...EIDING P8 VERSION 0129NM02INT01 INSTRUCTION MANUAL P8 P8 06A0RNM20ENG05 3 3 OVERVIEW OF PRODUCT 3 PRODUCT OVERVIEW Type 2S shutter EV Plug socket Cover lid Identification label with serial number LED...

Page 9: ...2INT01 INSTRUCTION MANUAL P9 P9 06A0RNM20ENG05 3 PRODUCT OVERVIEW 3 4 1 OVERVIEW OF CONNECTIONS 7 4 KW VERSION Neutral wire connection Phase wire connection Earth wire connection Power cable Cable cla...

Page 10: ...CTION MANUAL P10 P10 06A0RNM20ENG05 Tension relief data cable 3 PRODUCT OVERVIEW 3 4 2 OVERVIEW OF CONNECTIONS 11 KW VERSION Phase 1 Phase 2 Phase 3 Power cable inlet Cable clamp Earth Earthing pole N...

Page 11: ...cable 11 kW model CAT5 6 UTP cable 5 wires 1 5mm2 minimum accessories cable inlet Shunt connection L1 N from accessories cable ON OFF Peak connection L2 L3 from accessories cable 11 kW model RJ12 P1 p...

Page 12: ...charge point can also be connected to 1 phase In this case the charge point can only charge on 1 phase The electrician must select a suitable MCB with C characteristic to match the amperage setting of...

Page 13: ...Overview of Connections 7 4 kW Version or 3 4 2 Overview of Connections 11 kW Version section 5 4A LOAD SHEDDING CT FOR 7 4 KW MODEL The Current Transformer for Load Shedding included in box must be c...

Page 14: ...LED will indicate whether the connection is correct If the P1 LED does not show any signal please check if the RJ12 connectors are properly connected using a network cable tester If the led of the P1...

Page 15: ...5 Volts and should be connected to the 5V pin left on the module The middle pin is not used Step 9 Plug the power adapter into a power outlet The Power LED C must light up Step 10 Consult with the cu...

Page 16: ...ABLE LOCK If the installation requires a tethered cable solution the permanent cable lock feature can be enabled Move the righter dip switch underneath the rotary switches downwards to enable the perm...

Page 17: ...ak When the switch to On peak occurs while the car is charging the charge session will be delayed until another Off peak 7 USER MANUAL TROUBLESHOOTER 7 3 TROUBLESHOOTER DO YOU SEE A RED LED LIGHT ON Y...