Wiring advice*

Power cable size

Earthing advice*

Required nominal 

input voltage @ 

charge point

MCB

RCD

Load Shedding 

module (7,4kW)

Load Shedding 

module (11kW)

5 wires Ø 1,5mm

2

 

accessories cable 

for EV- and ZE-Ready 

installation

Ø 10mm - Ø 22,5mm

10mm

2

 solid wire

6mm

2

 stranded wire with end ferrules

PE-cable (Pen conductor is not allowed)

Separately installed grounding electrode < 100 
Ohm spreading resistance

230V+N +/-10% 50Hz

400V (3 x 230V+N) +/-10% 50Hz

Cable grommets sizes

Maximum cable terminal block

TN-system

TT-system

Single phase**

Triple phase**

4. INSTALLATION DETAILS

The electrician is responsible for selecting a cable thickness & safety components appropriate 

for the specific situation and according to regulations;

*   The electrician is always responsible for selecting a cable thickness appropriate for the specific situation and 

according to regulations;

**  3-phase charge point can also be connected to 1-phase. In this case the charge point can only charge on 

1-phase;

*** The electrician must select a suitable MCB with C-characteristic to match the amperage setting of the charge 

point, taking into account MCB manufacturer specifications and EV-Ready guidelines;

NOTE:

 The charge point can be set between 16A / 20A / 25A and 32A (depending on version), see chapter 6.

- Wire for the maximum hardware amperage under continuous load;
- Calculate with a COS-Phi of 0.8;
- Calculate with a max allowable voltage drop over the cable of 2%;
- Use shielded cable for underground wiring

C-characteristic***

30mA Type B, or 30mA Type A (Hi, Hpi, Si) in combination with appropriate
equipment that guarantees power shutdown at DC leakage of more than 6mA

Standard cable of 2x 1,5mm

2

 

With a maximum length of 100 meter

Standard CAT5 or CAT6 Ethernet cable (UTP cable with RJ12 6P6C straight 
connectors). With a maximum length of 100 meter

- L1, L2, L3, N + PE;
 

L1 & N for connecting the shunt

 

L2 & L3 for connecting the ON/OFF Peak signal

- Always connect PE to terminal blocks of charge point and at distribution board
- Use shielded cable for underground wiring

Summary of Contents for Home Advanced Edition 7

Page 1: ...100 cm Home Basic Edition 7 Home Basic Edition 11 VERSION 06A0RNM20ENG05 2020 INSTRUCTION MANUAL EN...

Page 2: ......

Page 3: ...arth terminal for protection purposes The AC input clamps must be fitted with an uninterruptible earth for protection purposes Ensure that the connection cables are fitted with fuses and circuit break...

Page 4: ...is not connected to a back office No online services or remote support are available for this charge point In case of an error or issue on site support is needed from a ZE Ready certified installer Y...

Page 5: ...ule only for 11 kW model Cable mount clips For EV and ZE Ready installation Cable 5 x 1 5mm2 minimum for shunt and ON OFF peak accessories For EV Ready installation Shunt options ABB S2C A2 in combina...

Page 6: ...protection class Certificates User interface Identification start charging Configuration Backoffice protocol Stand by consumption 06A _ _ _ _ _ _ 06B _ _ _ _ _ _ Home Basic Edition 7 single phase 32A...

Page 7: ...lled outdoors with a road proximity less then 5 meters 3 2 TECHNICAL SPECIFICATIONS CONTINUED 3 PRODUCT OVERVIEW P1 DONGLE SPECIFICATIONS 11 KW MODEL ONLY Operating temperature range Operating humidit...

Page 8: ...EIDING P8 VERSION 0129NM02INT01 INSTRUCTION MANUAL P8 P8 06A0RNM20ENG05 3 3 OVERVIEW OF PRODUCT 3 PRODUCT OVERVIEW Type 2S shutter EV Plug socket Cover lid Identification label with serial number LED...

Page 9: ...2INT01 INSTRUCTION MANUAL P9 P9 06A0RNM20ENG05 3 PRODUCT OVERVIEW 3 4 1 OVERVIEW OF CONNECTIONS 7 4 KW VERSION Neutral wire connection Phase wire connection Earth wire connection Power cable Cable cla...

Page 10: ...CTION MANUAL P10 P10 06A0RNM20ENG05 Tension relief data cable 3 PRODUCT OVERVIEW 3 4 2 OVERVIEW OF CONNECTIONS 11 KW VERSION Phase 1 Phase 2 Phase 3 Power cable inlet Cable clamp Earth Earthing pole N...

Page 11: ...cable 11 kW model CAT5 6 UTP cable 5 wires 1 5mm2 minimum accessories cable inlet Shunt connection L1 N from accessories cable ON OFF Peak connection L2 L3 from accessories cable 11 kW model RJ12 P1 p...

Page 12: ...charge point can also be connected to 1 phase In this case the charge point can only charge on 1 phase The electrician must select a suitable MCB with C characteristic to match the amperage setting of...

Page 13: ...Overview of Connections 7 4 kW Version or 3 4 2 Overview of Connections 11 kW Version section 5 4A LOAD SHEDDING CT FOR 7 4 KW MODEL The Current Transformer for Load Shedding included in box must be c...

Page 14: ...LED will indicate whether the connection is correct If the P1 LED does not show any signal please check if the RJ12 connectors are properly connected using a network cable tester If the led of the P1...

Page 15: ...5 Volts and should be connected to the 5V pin left on the module The middle pin is not used Step 9 Plug the power adapter into a power outlet The Power LED C must light up Step 10 Consult with the cu...

Page 16: ...ABLE LOCK If the installation requires a tethered cable solution the permanent cable lock feature can be enabled Move the righter dip switch underneath the rotary switches downwards to enable the perm...

Page 17: ...ak When the switch to On peak occurs while the car is charging the charge session will be delayed until another Off peak 7 USER MANUAL TROUBLESHOOTER 7 3 TROUBLESHOOTER DO YOU SEE A RED LED LIGHT ON Y...

Page 18: ......

Reviews: