newmotion Home Advanced Edition 7 Manual Download Page 13

INSTALLATIEHANDLEIDING – P13 

VERSION 0129NM02INT01 

INSTRUCTION MANUAL – P13  | 

P13

06A0RNM20ENG05

Thank you for installing this charge point. Make sure 
there is enough space to properly do the work. 
Ensure to work safely and take the safety of others into 
consideration as well, always work according to local 
safety regulations. Ask the owner if there is anything 
of significant importance that requires electricity in the 
house, before you turn of the electricity.
When selecting the mounting location of the charge point, 
ensure that future maintenance work can be carried out 
safely without obstruction.

5.1 PREPARATION

Step 1: Prepare the cabling & RCD and MCB (conform to 
local rules & regulations); 
Step 2: Indicate which circuit(s) the charge point is 
connected to in the distribution board;  
Step 3: Turn the socket lid anti-clockwise and out of the 
cover of the charge point; 
Step 4: Then pull the cover from the rear edge to open 
the charge point. Do not use any objects or tools to do 
this.

5.2 MECHANICAL MOUNT 

Step 1: Put the charge point back plate on the wall 
to check its placement (charge point is leveled and 
connector at +/- 1 m height). On the wall, mark the 
positioning of the top two and bottom two attachment 
points of the charge point and select the appropriate 
fixtures (plugs, screws and washers);
Step 2: Drill all four holes and put the plugs in place;
Step 3: Place the two provided plastic spacers at the 
backside of the bottom two attachment points. Secure 
the charge point to the wall using the top two and 
bottom two attachment points. Ensure that the rubber 
and stainless steel washers are used and placed on the 
back of the charge point at the bottom two attachment 
points.

5.3 POWER CONNECTION

 

Step 1: Select the appropriate grommet that suits the 
cable thickness and place it in the opening of the power 
cable inlet. Lubcirate if necessary to make it easier to 
feed the power cable through; 
Step 2: Secure the power cable using the cable clamp; 
Step 3: Connect the power to the terminal blocks, as 
indicated in the ‘3.4.1 Overview of Connections | 7,4 
kW Version’ or ‘3.4.2 Overview of Connections | 11 kW 
Version’ section.

5.4A LOAD SHEDDING - CT FOR 7,4 KW 

MODEL

The Current Transformer for Load Shedding (included 
in box) must be connected to the phase used by the 
charge point at the most upstream point of the house 
grid, closest to the house grid connection.
Step 1: Install the CT on the same phase used by the 
charge point, measuring the whole household. Place the 
terminal block on a DIN-rail in the fusebox;
Step 2: Place a standard cable of 2x 1,5mm

2

 (not 

supplied) and connect two wires on both terminal blocks 
in the charge point as indicated in the ’3.4.3 Overview 
Installing Accessories’ section. Then place the cable 
of 2x 1,5mm

2

 to the CT ring on the side of the grid 

connection. The maximum length of the cable is 100m.

5.4B LOAD SHEDDING MODULE FOR 11 

KW MODEL 

 

The Load Shedding Module package contains one Load 
Shedding module, one power adapter and three current 
transformers (CT’s). The CT’s must be connected at 
the most upstream point of the house grid, closest to 
the grid connection. Arrows are shown on the CT, but 
direction is not important.
The connections for the CT’s are located at the bottom 
of the Load Shedding module, and are labelled with 
L1, L2 and L3 on the front label. L1, L2 and L3 must be 
connected to the first, second and third phase of the 
house grid in the correct order.
Although each measuring head is provided with two 
different coloured threads, the polarity of connection is 
not important.
The power cable connection on the terminal block of 
the charge point should match the L1, L2 and L3 in the 
charge point. 
For a 1 phase installed charge point the L1 measurement 
head should match the conduction which is connected 
to the L1 of the terminal block.

Installation procedure

Step 1: Install the Load Shedding module on the DIN Rail 
in the fuse box;
Step 2: Connect the CT(’s) to the Load Shedding 
module, as described in the beginning of this paragraph;
Step 3: Apply the CT(’s) to the grid connection(s). Make 
sure to apply the CT(’s) so that the total power usage of 
the household is measured on each phase;
Step 4: Connect the power adapter to the Load 
Shedding module. One of the two power adapter wires

5. INSTALLATION PROCEDURE

Summary of Contents for Home Advanced Edition 7

Page 1: ...100 cm Home Basic Edition 7 Home Basic Edition 11 VERSION 06A0RNM20ENG05 2020 INSTRUCTION MANUAL EN...

Page 2: ......

Page 3: ...arth terminal for protection purposes The AC input clamps must be fitted with an uninterruptible earth for protection purposes Ensure that the connection cables are fitted with fuses and circuit break...

Page 4: ...is not connected to a back office No online services or remote support are available for this charge point In case of an error or issue on site support is needed from a ZE Ready certified installer Y...

Page 5: ...ule only for 11 kW model Cable mount clips For EV and ZE Ready installation Cable 5 x 1 5mm2 minimum for shunt and ON OFF peak accessories For EV Ready installation Shunt options ABB S2C A2 in combina...

Page 6: ...protection class Certificates User interface Identification start charging Configuration Backoffice protocol Stand by consumption 06A _ _ _ _ _ _ 06B _ _ _ _ _ _ Home Basic Edition 7 single phase 32A...

Page 7: ...lled outdoors with a road proximity less then 5 meters 3 2 TECHNICAL SPECIFICATIONS CONTINUED 3 PRODUCT OVERVIEW P1 DONGLE SPECIFICATIONS 11 KW MODEL ONLY Operating temperature range Operating humidit...

Page 8: ...EIDING P8 VERSION 0129NM02INT01 INSTRUCTION MANUAL P8 P8 06A0RNM20ENG05 3 3 OVERVIEW OF PRODUCT 3 PRODUCT OVERVIEW Type 2S shutter EV Plug socket Cover lid Identification label with serial number LED...

Page 9: ...2INT01 INSTRUCTION MANUAL P9 P9 06A0RNM20ENG05 3 PRODUCT OVERVIEW 3 4 1 OVERVIEW OF CONNECTIONS 7 4 KW VERSION Neutral wire connection Phase wire connection Earth wire connection Power cable Cable cla...

Page 10: ...CTION MANUAL P10 P10 06A0RNM20ENG05 Tension relief data cable 3 PRODUCT OVERVIEW 3 4 2 OVERVIEW OF CONNECTIONS 11 KW VERSION Phase 1 Phase 2 Phase 3 Power cable inlet Cable clamp Earth Earthing pole N...

Page 11: ...cable 11 kW model CAT5 6 UTP cable 5 wires 1 5mm2 minimum accessories cable inlet Shunt connection L1 N from accessories cable ON OFF Peak connection L2 L3 from accessories cable 11 kW model RJ12 P1 p...

Page 12: ...charge point can also be connected to 1 phase In this case the charge point can only charge on 1 phase The electrician must select a suitable MCB with C characteristic to match the amperage setting of...

Page 13: ...Overview of Connections 7 4 kW Version or 3 4 2 Overview of Connections 11 kW Version section 5 4A LOAD SHEDDING CT FOR 7 4 KW MODEL The Current Transformer for Load Shedding included in box must be c...

Page 14: ...LED will indicate whether the connection is correct If the P1 LED does not show any signal please check if the RJ12 connectors are properly connected using a network cable tester If the led of the P1...

Page 15: ...5 Volts and should be connected to the 5V pin left on the module The middle pin is not used Step 9 Plug the power adapter into a power outlet The Power LED C must light up Step 10 Consult with the cu...

Page 16: ...ABLE LOCK If the installation requires a tethered cable solution the permanent cable lock feature can be enabled Move the righter dip switch underneath the rotary switches downwards to enable the perm...

Page 17: ...ak When the switch to On peak occurs while the car is charging the charge session will be delayed until another Off peak 7 USER MANUAL TROUBLESHOOTER 7 3 TROUBLESHOOTER DO YOU SEE A RED LED LIGHT ON Y...

Page 18: ......

Reviews: