background image

INSTALLATIEHANDLEIDING – P7 

VERSION 0129NM02INT01 

INSTRUCTION MANUAL – P7  | 

P7

07A0RNM20ENG05

*   The maximum charge capacity of the charge point depends on several factors. This includes: local rules & regulations, 
the type of EV, the grid connection at your location and the electricity usage of your building;
**  Use the configuration software in order to change the charge capacity (only on site - locally - possible by an installer);
*** The charge point shall not be exposed to direct water jets or cleaned with high water pressure devices. The charge 
point shall not be installed outdoors with a road proximity less then 5 meters.

3.2 TECHNICAL SPECIFICATIONS (CONTINUED)

3. PRODUCT OVERVIEW

P1 DONGLE SPECIFICATIONS

Backoffice protocol

Stand-by consumption

Operating temperature range

Operating humidity range

Operating air pressure range

Maximum mounting height socket

Advised mounting height socket

Mounting position 

Function for ventilation according to IEC-61851

Configuration

OCPP protocol

3-5W

-30℃ to +50℃

5% to 95%

860 hPa to 1060 hPa

1.5 meter above ground

1 meter above ground

Vertical and upright postion only

Not supported

Local configuration using the Installer App on a 
smartphone

Dimensions

Weight

Required input

Operating humidity range

Operating temperature range

Certificates

Enclosure of the electrival cabinet requirement

55x25x30 mm

27 gr

5V DC - 100mA

5-95%

5-55 °C

CE
IEC62368-1:2014
Immunity according to EN 61326-1:2013

Must be able to resist a force of 250N

Summary of Contents for Home Advanced Edition 11

Page 1: ...100 cm Home Advanced Edition 7 Home Advanced Edition 11 INSTRUCTION MANUAL EN VERSION 07A0RNM20ENG05 2020...

Page 2: ......

Page 3: ...th terminal for protection purposes The AC input clamps must be fitted with an uninterruptible earth for protection purposes Ensure that the connection cables are fitted with fuses and circuit breaker...

Page 4: ...d charge point can be connected to a Charge Point Operator CPO backoffice via WiFi or ethernet In case of an error or issue on site support is needed from a ZE Ready certified installer Your Renault d...

Page 5: ...5 or CAT6 RJ45 UTP cable crimp tool RJ45 connectors Network cable tester For Load Shedding functionality RJ12 cable straight for Load Shedding module connection Free schuko socket in fuse box for powe...

Page 6: ...unication backoffice Communication Load Shedding module 07A _ _ _ _ _ 07B _ _ _ _ _ Home Advanced 7 single phase 32A Home Advanced 11 triple phase 16A Home Advanced 7 3 7 kW single phase 16A Home Adva...

Page 7: ...IFICATIONS CONTINUED 3 PRODUCT OVERVIEW P1 DONGLE SPECIFICATIONS Backoffice protocol Stand by consumption Operating temperature range Operating humidity range Operating air pressure range Maximum moun...

Page 8: ...P8 VERSION 0129NM02INT01 INSTRUCTION MANUAL P8 P8 07A0RNM20ENG05 3 3 OVERVIEW OF PRODUCT 3 PRODUCT OVERVIEW Type 2S shutter EV Plug socket Cover lid RFID Reader Identification label with serial numbe...

Page 9: ...02INT01 INSTRUCTION MANUAL P9 P9 07A0RNM20ENG05 3 PRODUCT OVERVIEW 3 4 1 OVERVIEW OF CONNECTIONS Ethernet port Earthing pole UTP data cable inlet with rubber seal Inlets for power cables Power cables...

Page 10: ...ENG05 3 PRODUCT OVERVIEW 3 4 2 OVERVIEW INSTALLING ACCESSORIES 5 wires 1 5mm2 accessories cable inlet Cable clamp ON OFF Peak connection L2 L3 from accessories cable P1 Port for Load Shedding Shunt co...

Page 11: ...ate for the specific situation and according to local regulations The installer must select a suitable MCB with C characteristic to match the amperage setting of the charge point taking into account M...

Page 12: ...during installation 5 4 LOAD SHEDDING MODULE The Load Shedding Module package contains one Load Shedding module one power adapter and three current transformers CT s The CT s must be connected at the...

Page 13: ...appropriate grommet to suit the cable thickness and place it in the opening of the power cable inlet Lubricate if necessary to make it easier to feed the power cable through Step 3 Remove the wire bri...

Page 14: ...r indirectly via a switch or hub 5 8 FINISHING UP CLOSE ENCLOSURE Step 1 Check and make sure that the rubber seal of the casing is properly in place on the edge Step 2 Place the cover on the charge po...

Page 15: ...Follow the steps as described in the Home Charging by NewMotion app Use the QR Code for WiFi connection which is included in the charge point package when the Home Charging by NewMotion app requests...

Page 16: ...rge session 7 USER MANUAL Position C Charging will only happen in Off peak When the switch to On peak occurs while the car is charging the charge session will be delayed until another Off peak 7 3 TRO...

Page 17: ......

Reviews: