newmotion Home Advanced Edition 11 Instruction Manual Download Page 5

INSTALLATIEHANDLEIDING – P5 

VERSION 0129NM02INT01 

INSTRUCTION MANUAL – P5  | 

P5

07A0RNM20ENG05

Wall mounting

Installation materials 

Installation & 

configuration of 

accessories 

Required tools & additional materials 

(not provided)

- 4x 6.3mm x 70mm Self Tapping pan 

head Torx screws (DIN 7981C) stainless 
steel (A4); 

- 4x plugs; 
- 4x Stainless steel (A4) washers; 
- Drill and bit; 
- Torx screwdrivers (T20); 
- Voltage tester; 
- Tape measure; 
- Spirit level

- Power cable; 
- Cable mount clips; 
- RCD & MCB;  
- For local configuration, a smartphone 

with Installer App

- For EV- and ZE-Ready installation:
  Cable 5 x Ø 1,5mm2 (minimum) for shunt 

and ON/OFF peak accessories;

- Cable mount clips; 
- UTP cable (CAT5 or CAT6); 
- RJ45 UTP cable crimp tool; 
- RJ45 connectors;
- Network cable tester; 

- For Load Shedding functionality:     
- RJ12 cable (straight) for Load Shedding 

module connection;

- Free schuko socket in fuse box for power 

supply of Load Shedding module;

- Shunt 3 options:
  > ABB S2C-A2 in combination with S200 

MCB or DS200 RCD

  > Schneider IMX A9A26946 in 

combination with ACTI9 RCD or MCB

  > Legrand DX3 shunt trip (406278) in 

combination with DX3 RCD or MCB

Package contents with charge point

- Charge point; 
- Rubber grommets (various sizes); 
- 2x Plastic spacers;
- 1x M4 x 16 mm bolt (Torx); 
- 6x M4 x 12 mm bolts (Torx);

- 2x Power cable clamps; 
- 2x UTP data cable inlet with rubber seal

- Load Shedding module for Load 

Shedding functionality;

- P1 dongle for Load Shedding 

functionality (black);

- QR code for WiFi connection

3. PRODUCT OVERVIEW

3.1 MOUNTING, PACKAGE CONTENTS AND REQUIRED TOOLS

Summary of Contents for Home Advanced Edition 11

Page 1: ...100 cm Home Advanced Edition 7 Home Advanced Edition 11 INSTRUCTION MANUAL EN VERSION 07A0RNM20ENG05 2020...

Page 2: ......

Page 3: ...th terminal for protection purposes The AC input clamps must be fitted with an uninterruptible earth for protection purposes Ensure that the connection cables are fitted with fuses and circuit breaker...

Page 4: ...d charge point can be connected to a Charge Point Operator CPO backoffice via WiFi or ethernet In case of an error or issue on site support is needed from a ZE Ready certified installer Your Renault d...

Page 5: ...5 or CAT6 RJ45 UTP cable crimp tool RJ45 connectors Network cable tester For Load Shedding functionality RJ12 cable straight for Load Shedding module connection Free schuko socket in fuse box for powe...

Page 6: ...unication backoffice Communication Load Shedding module 07A _ _ _ _ _ 07B _ _ _ _ _ Home Advanced 7 single phase 32A Home Advanced 11 triple phase 16A Home Advanced 7 3 7 kW single phase 16A Home Adva...

Page 7: ...IFICATIONS CONTINUED 3 PRODUCT OVERVIEW P1 DONGLE SPECIFICATIONS Backoffice protocol Stand by consumption Operating temperature range Operating humidity range Operating air pressure range Maximum moun...

Page 8: ...P8 VERSION 0129NM02INT01 INSTRUCTION MANUAL P8 P8 07A0RNM20ENG05 3 3 OVERVIEW OF PRODUCT 3 PRODUCT OVERVIEW Type 2S shutter EV Plug socket Cover lid RFID Reader Identification label with serial numbe...

Page 9: ...02INT01 INSTRUCTION MANUAL P9 P9 07A0RNM20ENG05 3 PRODUCT OVERVIEW 3 4 1 OVERVIEW OF CONNECTIONS Ethernet port Earthing pole UTP data cable inlet with rubber seal Inlets for power cables Power cables...

Page 10: ...ENG05 3 PRODUCT OVERVIEW 3 4 2 OVERVIEW INSTALLING ACCESSORIES 5 wires 1 5mm2 accessories cable inlet Cable clamp ON OFF Peak connection L2 L3 from accessories cable P1 Port for Load Shedding Shunt co...

Page 11: ...ate for the specific situation and according to local regulations The installer must select a suitable MCB with C characteristic to match the amperage setting of the charge point taking into account M...

Page 12: ...during installation 5 4 LOAD SHEDDING MODULE The Load Shedding Module package contains one Load Shedding module one power adapter and three current transformers CT s The CT s must be connected at the...

Page 13: ...appropriate grommet to suit the cable thickness and place it in the opening of the power cable inlet Lubricate if necessary to make it easier to feed the power cable through Step 3 Remove the wire bri...

Page 14: ...r indirectly via a switch or hub 5 8 FINISHING UP CLOSE ENCLOSURE Step 1 Check and make sure that the rubber seal of the casing is properly in place on the edge Step 2 Place the cover on the charge po...

Page 15: ...Follow the steps as described in the Home Charging by NewMotion app Use the QR Code for WiFi connection which is included in the charge point package when the Home Charging by NewMotion app requests...

Page 16: ...rge session 7 USER MANUAL Position C Charging will only happen in Off peak When the switch to On peak occurs while the car is charging the charge session will be delayed until another Off peak 7 3 TRO...

Page 17: ......

Reviews: