background image

12

15272 Newsboy Circle
Huntington Beach
California 92649

                              

  

Phone:  714-751-0488  

                                     Fax: 714-856-9679 

     E-Mail: [email protected]

PoweringTheNetwork.com

2) 

Digital Meter Programming Sequence:

Screen diagram reference number, corresponds to flow chart on page 11.

1)

 Home screen: displays DC voltage & total amperage consumed by system (loads and battery charge current), and  

 

  temperature in degrees Celsius. When in programming mode the screen will revert to home after 30 second of    

 

  inactivity. Note, it is normal the ammeter may toggle between 0 and 1 amp with no load or battery connected.

  

  

1B)

 If system battery is disconnected, screen will automatically display “Batt Offline” until battery is reconnected.

Rotating the knob will select other screens, or pushing the menu button will take you directly to the alarm screen.

2)

 LVD settings Screen: Displays the disconnect and reconnect voltages

Rotate knob to: 

3)

 Ambient Temperature Screen: Displays temperature in degrees C and F.

Rotate knob to:

4)

 Programming Portal Screen: Displays when in 'ready to program' mode; push of menu button to move to  

 

 

  programming screens, or rotating knob displays alarm screen (#5)

 

4A

->LVD voltage disconnect Screen, press programming button to enter set mode, rotate knob to change, push to    

 

       confirm setting. See page 13 for detailed directions.

 

4B

->LVD voltage connect Screen, press programming button to enter set mode, rotate knob to change, push to  

 

 

       confirm setting. See page 13 for detailed directions.

 

4C

->LVC pre disconnect voltage screen, press programming button to enter voltage at which pre trip alarm should   

 

        activate, push to confirm setting. See page 13 for detailed directions.

Rotate knob to:

 

4D

 Display brightness setting , press programming button to enter adjustment mode, rotate knob to change, push    

 

     button to confirm

Rotate knob to:

 

4E)

 Restore factory setting screen, press programming button to access authorization screen, rotate knob to yes if    

 

      you wish to apply factory global factory default settings, press programing button to confirm.

Rotate knob to:

 

4F)

 Exit screen, press programming button to return to Programming portal screen (ref #4)

                

5)

 Alarm system status screen: displays ’system ok’ if no alarms have been tripped.

           

5B)

 If alarm conditions are present, screen will automatically display what alarm condition has occurred”

• BRK OFF= Breaker off

• LVDdiscon= Low voltage disconnect activated

• Prelvd= voltage approaching disconnect point, disconnect eminent.

• CHK PM= Summary alarm received from rectifier

Rotate knob to return to Home screen.            

                

Summary of Contents for PFM-500

Page 1: ...ng E Output Wiring 5 1 Unswitched Output 2 Switched Output F Battery Wiring 6 G Status and Alarm Contact Wiring 7 H Chassis Grounding 8 I Circuit Breakers 8 1 Breaker Installation 2 Breaker Functions...

Page 2: ...TERY POSITIVE NEGATIVE OR FLOATING GROUND STATUS CONTACTS RETURN GND INPUT 1 INPUT 2 INPUT 3 LVD SUMMARY ALARM OUTPUT INPUT 4 INPUT 5 INPUT 6 NC NO C CONTACTS SHOWN IN FAILED POSITION 1 2 3 1 2 3 1 2...

Page 3: ...osing flush mounting C Bus Bar Mounting The PFM is shipped with a rackmount ground bus bar assembly kit BBA 800 The bus bar is typically mounted on the rear of the rack and is designed for installatio...

Page 4: ...Hot Wire to POSITIVE OUTPUT Terminal Positive Ground Systems Connect Ground Wire to POSITIVE OUTPUT Terminal and Hot Wire to NEGATIVE OUTPUT Terminal Power Plugs shown present only if using NEWMAR QC...

Page 5: ...for proper PFM input wire gauges 3 A return ground wire must also be run from the BBA bus bar or other grounding point to the terminal on the PFM labeled RETURN GND This is not a system ground rather...

Page 6: ...s requires installation of a model PBA plug in breaker available from NEWMAR at that position See section II I Fig 7 for installation details and breaker functions See section VII for available ampera...

Page 7: ...ness is designed for installations which employ NEWMAR Power Modules though it may be modified for use with other types of equipment as well provided they are equipped with Form C or Normally Open N O...

Page 8: ...nd a summary alarm from the DST is required this may be accomplished through parallel wiring of the status wires Please contact the factory for information on how to perform this modification When wir...

Page 9: ...reaker receptacle and pushing firmly into place The two top auxiliary contact terminals in the middle of the breaker should press against the mating clips The bottom auxiliary contact is unused in thi...

Page 10: ...e or the battery side by using the selector switch on front panel Powering the meter from the rectifier side default causes the PFM 500 to completely shutdown during a Low Battery Voltage Disconnect t...

Page 11: ...8 Fax 714 856 9679 E Mail techservice newmarpower com PoweringTheNetwork com C LCD Display 1 Digital Meter Programming Sequence Flow Chart Figure 8 Digital Meter Programming Sequence Flow Chart see pa...

Page 12: ...voltage disconnect Screen press programming button to enter set mode rotate knob to change push to confirm setting See page 13 for detailed directions 4B LVD voltage connect Screen press programming...

Page 13: ...ngs and is retained even after powering down the unit LVD threshold adjustment can be made while the system is operating 3 LVD Alarms Pre disconnect disconnect Two external alarms can be triggered by...

Page 14: ...Section III D for LVD adjustment procedure 4 PFM load circuit breaker tripped Breaker is in mid trip position Note Breaker will not activate the ALARM L E D if manually switched into the off position...

Page 15: ...power com Anytime We are happy to consult with you to resolve any problems or questions you may have If during consultation it appears the PFM must be returned to the factory for repair we will issue...

Page 16: ...low TEMPERATURE RATING 0 C to 60 C CASE SIZE H x W x D 3 5 x 19 or 23 x 20 5 LVD SPECIFICATIONS Factory set actuation voltages 12 Volt 24 Volt 48 Volt Disconnect 10 4V DC 21 0V DC 42 0V DC Connect 12...

Reviews: