
29
Newmar • 1580 Sunflower Ave, Suite 100, Costa Mesa, CA 92626
Phone: 714-751-0488 • E-mail: [email protected]
A
PPENDIX
3 –
INSTALLATION OF AC Junction Box
Loosen Screws to Remove Cover x 4
1 x 3/4" NM Cable Clamp
1.
The above illustration shows the rear and side of the AC junction box.
2.
To remove the junction box cover, loosen the four screws located at the top of the AC junction
box.
3.
Loosen cable clamp screws and route AC cables though cable clamps. Connect AC cables to AC
input terminal block. (See Centurion II Input wiring options (M-C2ACOPT) drawings for wiring
options)
4.
Tighten cable clamp screws and confirm the cables are firmly secured.
5.
Re-install top cover and tighten screws.
Cable Tie
Mount
Supplied
Cable
Clamps
2
x
3
/8"
NM
Cable
Clamp
AC Junction Box
(
Right Rear)
Centurion II
Rectifier Shelf