“LCD-1”
Liquid
Coffee
Dispenser
NEWCO Enterprises Phone: 1.800.325.7867 Fax: 1.636.925.0029 7.22.09
2 of 29
PN: 121314
Section 1 – Installation Instructions
Section 2 – Set-Up Programming Instructions
Section 3 – Service Level Programming Instructions
Section 1
Installation Instructions:
Place Machine on a Level Countertop Surface
Connect ¼ Inch Flare water Supply to the Water Inlet
located on lower Left Rear of the Machine.
(
(
N
N
E
E
W
W
C
C
O
O
r
r
e
e
c
c
o
o
m
m
m
m
e
e
n
n
d
d
s
s
c
c
o
o
p
p
p
p
e
e
r
r
t
t
u
u
b
b
i
i
n
n
g
g
f
f
o
o
r
r
u
u
s
s
e
e
a
a
s
s
w
w
a
a
t
t
e
e
r
r
s
s
u
u
p
p
p
p
l
l
y
y
t
t
o
o
a
a
l
l
l
l
o
o
f
f
o
o
u
u
r
r
b
b
r
r
e
e
w
w
i
i
n
n
g
g
e
e
q
q
u
u
i
i
p
p
m
m
e
e
n
n
t
t
)
)
Turn water Supply On
Plug or wire brewer to the appropriate voltage circuit as
indicated on the
serial tag
.
Locate power switch on the lower left rear of the machine
and turn machine power on.
Machine will begin to fill.
If machine has not filled to probe level within 2 minutes it will enter an error
mode. Error code E-4 will appear on the display screen. To reset the error
and resume filling turn power switch off and then on.
When water in tank reaches probe level, heating cycle will
begin.
You are now ready to proceed to Set-Up Programming.