2
Parts Supplied
Unpacking
• Begin by placing the package on a covered flat surface.
• Remove all cardboard, foam packaging material and clear plastic bags.
• Dispose / recycle all packaging materials.
• Verify all the contents in the box and gather the required tools. See “Parts” and “Tools Needed” in the list below.
Descrip
ti
on
Quan
ti
ty
1.5” x 1.5” x 6” Ceiling Moun
ti
ng Angle
4
1.5” x 1.5” x 18” Ver
ti
cal Angle Posts
4
1.5” x 1.5” x 27” Ver
ti
cal Angle Posts
4
1” x 2.75” x 48” Short Perimeter Beam
2
1” x 2.75” x 51” Long Perimeter Beam A
2
1” x 2.75” x 51” Long Perimeter Beam B
2
47” Cross Supports
6
Center Support Beam
1
Steel Grid Pla
tf
orms
2
Steel Grid Pla
tf
orms with Notched Corners
2
Hardware Box
1
1/4” Diameter x 3/4” Long Bolts
24
1/4” Nylon Lock Nut
24
1/4” Diameter x 3” Long Lag Bolt
8
1/4” Washers
56
Vertical Angle Posts
Ceiling
Mounting
Angle
Center
Support Beam
Cross
Supports
Short
Perimeter Beam
Long Perimeter
Beams (A+B)
Steel Grid Platforms
Hex Bolt
(1/4” dia x 3/4”)
Washer (1/4”)
Lock Nut
(1/4”)
Lag Bolt (1/4”dia x 3”)