4 - WORKING OPERATIONS
Backfilling
Approach the pile with a flat bucket. Poor methods move
no more dirt and make it more difficult to hold a level
grade.
(1)
Do this
NHIL13CT00882AA
22
When bulldozing, do not use the bucket in the dumped
position. This method forces severe shock loadings on
the dump linkage, the bucket cylinder, and the tractor.
(2)
Not this
NHIL13CT00883AA
23
Leave dirt in the bucket. Dumping on each pass wastes
time.
NHIL13CT00884AA
24
Operate at right angles to the ditch and take as large of a
bite as the tractor can handle without lugging down.
(1)
Soil pile
(2)
Ditch
NHIL13CT00885AA
25
4-8
Summary of Contents for 140TL
Page 4: ......
Page 50: ...3 OPERATING INSTRUCTIONS 3 18...
Page 62: ...4 WORKING OPERATIONS 4 12...
Page 70: ...5 MAINTENANCE 5 8...
Page 72: ...6 TROUBLESHOOTING 6 2...
Page 80: ...8 ACCESSORIES 8 2...
Page 85: ......