NVF-200SE/PD Power over VDSL Master/Slave USER’S MANUAL Ver. B.4
8
Chapter 2.
Installing the Bridge
2.1 Hardware Installation
This chapter describes how to install the bridge and establishes network connections. You may install the bridge on
any level surface (e.g. a table or shelf). However, please take note of the following minimum site requirements before
you begin.
2.2 Pre-installation Requirements
Before you start the actual hardware installation, make sure you can provide the right operating environment including
power requirements, sufficient physical space and proximity to other network devices that are to be connected.
Verify the following installation requirements:
•
Power requirements: 2 x 48VDC / 0.4A
•
The bridge should be located in a cool dry place with at least 10cm / 4in of space at the front and back for
ventilation.
•
Place the bridge away from direct sunlight, heat sources, or areas with a high amount of
electromagnetic interference.
•
Check if the network cables and connectors needed for installation are available.
•
Do Not install phone lines strapped together with AC power lines, or telephone office line with voice signal.
•
Avoid installing this device with radio amplifying station nearby or transformer station nearby.
•
Please connecting FG of NVF-200SE and NVF-200PD on rear panel to earth ground.