
9. Click the End Date field and select the date from the pop-up menu.
Your end date displays.
10. For each day of the week that you want to schedule PoE, use the sliders to set the
ranges.
Green indicates that PoE is enabled.
11. When your settings are complete, click the APPLY button.
The schedule is enabled.
Edit or disable a PoE schedule
To edit the or disable a PoE schedule:
1. Open a web browser from a computer that is connected to the same network as the
switch, or connected directly to the switch through an Ethernet cable.
2. Enter the IP address that is assigned to the switch.
A login window opens.
3. Enter the device management password.
The password is the one that you specified the first time that you logged in. The
password is case-sensitive.
The HOME page displays.
4. Select POE.
The Power over Ethernet (PoE) page displays.
5. Select POE SCHEDULE.
The PD SCHEDULE page displays.
6. If your configured schedule applied to a single port and you want to apply it to more
than one port, click the button to select Group port configuration.
7. To change which PoE ports are scheduled, click one or more ports.
When a port is selected, the port button displays solid purple.
8. To change the start date, click the Start Date field and select the date from the
pop-up menu.
Your new start date displays.
9. To change the end date, click the End Date field and select the date from the pop-up
menu.
Your new end date displays.
User Manual
100
Maintain and Monitor the Switch
Gigabit Ethernet Plus Switches