![NETGEAR GC510P Hardware Installation Manual Download Page 3](http://html1.mh-extra.com/html/netgear/gc510p/gc510p_hardware-installation-manual_1672463003.webp)
Contents
Chapter 1 Introduction
Overview................................................................................................................6
Features.................................................................................................................7
Safety Instructions and Warnings..........................................................................8
Chapter 2 Hardware Overview
Hardware Description..........................................................................................12
Front Panel......................................................................................................12
Back Panel......................................................................................................12
LEDs...............................................................................................................13
Switch Hardware Interfaces.................................................................................14
RJ-45 Ports for 10/100/1000M BASE-T Ethernet Connectivity.......................14
SFP Ports for Fiber Connectivity.....................................................................15
Multi-Function Reset Button............................................................................15
Chapter 3 Applications
PoE Applications..................................................................................................18
PoE Overview..................................................................................................18
Connect PoE Equipment in a Business Environment......................................19
Connect PoE Equipment for Surveillance and Security..................................20
Desktop Switching...............................................................................................21
Chapter 4 Installation
Step 1: Prepare the Site.......................................................................................23
Step 2: Protect Against Electrostatic Discharge...................................................23
Step 3: Unpack the Switch...................................................................................24
Step 4: Install the Switch......................................................................................25
Install the Switch on a Flat Surface.................................................................25
Wall-Mount the Switch.....................................................................................25
Wall-Mount the Switch Horizontally With the Back Panel Facing Down.....26
Wall-Mount the Switch Horizontally With the Back Panel Facing Up..........27
Wall-Mount the Switch Vertically With the Back Panel Facing Left.............29
Poor Wall-Mounting Position.......................................................................30
Mount the Switch to a Pole or Another Surface...............................................31
Install the Switch in a Rack.............................................................................31
Optional Step 5: Install SFP Transceiver Modules...............................................31
Step 6: Connect Devices to the Switch................................................................32
Step 7: Check the Installation..............................................................................32
Step 8: Apply Power and Check the LEDs...........................................................33
Step 9: Manage the Switch..................................................................................33
3