4
Installation
This chapter describes the installation procedures for the switch. Switch installation involves the steps described
in the following sections:
•
Step 1: Prepare the Site
•
Step 2: Protect Against Electrostatic Discharge
•
Step 3: Unpack the Switch
•
Step 4: Install the Switch
•
Optional Step 5: Install SFP Transceiver Modules
•
Step 6: Connect Devices to the Switch
•
Step 7: Check the Installation
•
Step 8: Apply Power and Check the LEDs
•
Step 9: Manage the Switch
22