If the airflow vents at the rear of the chassis are blocked by cables or labels, it can lead to premature
component failures due to overheating.
1
Cable the compute node.
If you are adding nodes to an existing NetApp HCI installation, ensure that the cabling and network
configuration of the nodes that you add are identical to the existing installation.
Cable the node
|
Stage
3
H410C compute nodes (choose option A or B)
Connect two SFP28/SFP+ cables or transceivers
for shared management, virtual machines, and
storage connectivity.
(Optional, recommended)
Connect a CAT5e cable in the IPMI port for
out-of-band management connectivity.
10/25GbE cables
Two-cable configuration
OPTION
A
Port D
Port E
IPMI
Connect two CAT5e or higher cables in ports
A and B for management connectivity.
Connect two SFP28/SFP+ cables or transceivers
in ports C and F for virtual machine connectivity.
Connect two SFP28/SFP+ cables or transceivers
in ports D and E for storage connectivity.
(Optional, recommended)
Connect a CAT5e cable in the IPMI port for
out-of-band management connectivity.
10/25GbE cables
1/10GbE cables
Six-cable configuration
OPTION
B
Port D
Port E
Port F
IPMI
Port C
Port A
Port B