![NetApp FAS2500 Replacement Download Page 8](http://html1.mh-extra.com/html/netapp/fas2500/fas2500_replacement_1669949008.webp)
III.
Step
20
Move the console cable to the
TARGET
system if not already connected and verify the console response.
a)
b)
To review the steps for performing a Manual Takeover, click >>
21
a)
At the "Waiting for giveback ……" prompt, Enter:
Ctrl-C
b)
At the message: "Do you wish to halt this node rather than wait [y/n]? " Enter:
y
c)
After the system drops to the
LOADER-A|B>
prompt, skip to step 22.
22
Go to Section IV "Capture the Current System Configuration" on next page.
IF the console response is the LOADER prompt or "Waiting for giveback", go to step 21 below.
IF HA-Pair and both nodes are up
,
engage end-user
to “takeover” the TARGET node from the PARTNER.
IF non-HA and node is up,
engage end-user
to "halt" the TARGET node.
Once the "takeover" or "halt" is complete, go to step 21 below.
Move console cable to the
TARGET
node if not already connected. If the console response is: "
Waiting for giveback…...
"
follow steps (a-c) below. If console response is LOADER-A|B> skip to step 22 below.
Page 7 of 25
FAS2500 Model : Node State Check and Shutdown Procedure (cont.)
Action Description
Waiting for giveback...(Press Ctrl-C to abort wait)
^C
This node was previously declared dead.
Pausing to check HA partner status....
...............
...............
The HA partner is currently operational and in takeover mode.
...............
waiting for giveback...
Do you wish to halt this node rather than wait [y/n]?
y
Halting...
.......
LOADER-A>
Enter:
y
Enter:
CTRL-C
Information on
Partner Status
Boot Device Replacement for the FAS2500
For NetApp Authorized Service Engineers