![NetApp 42U 1280 mm System Cabinet Manual Download Page 20](http://html.mh-extra.com/html/netapp/42u-1280-mm-system-cabinet/42u-1280-mm-system-cabinet_manual_1669923020.webp)
4. Plug each PDU power cable into individual AC power sources that are on separate AC circuits.
5. Turn on the power switches or circuit breakers to the PDUs.
6. Turn on the power to your components, and then boot the system.
7. Close and lock the system cabinet doors.
20 | 42U 1280 mm System Cabinet Guide
Summary of Contents for 42U 1280 mm System Cabinet
Page 2: ......