Installation
Guide
Door Assembly
Construct the doors on a hard flat surface.
Take a vertical door tube (without latch)
and slide on two door hinges roughly 200mm
from the tube ends then assemble the rest
of the door
(SEE FIG8).
Make sure the push button on the top & bottom
frame locks into the tubes holes.
Door Installation
The door kit includes x2 upright tubes which
allows you to position the door in any location
around the fruit cage.
Door Upright Position
Establish where you want te door on fruit cage,
From the post measure 1065mm centres across and
position a ground spike keeping the tube in
line with the others.
(SEE FIG9)
. When installing
door you may find the positioning slightly off,
if this is the case re establish your ground spike
to the desired position.
1065mm
This completes the basic construction for the 1st bay of the fruit cage. For the rest of the construction
follow these techniques until you have completed your framework to the required size and shape.
Attach a 5 way connector (from corner extender
kit) to the centre tube, once locked into place
attach horizontal tube into 4 way connector
then into 5 way connector. Repeat this step for
the perpendicular tube from 5 way connector.
(SEE FIG7)
200mm
Latch
FIG7
FIG8
FIG9
The below diagram shows a 4mx4m cage assembled.
3 Way Connector
4 Way Connector
5 Way Connector