
Gottlieb
Nestle
GmbH | Freudenstädter Str. 37-43 | 72280 Dornstetten
| www.g-nestle.de
17.3 Learn with the guide
Many tasks are listed in a tutorial - the guide. With its help, many tasks can be learned easily.
•
choose
from the main menu,
•
choose
•
Set a desired task in the selection and follow the instructions.
17.4 Measure / record points and elements
Note:
For your own safety, always measure at least two known points in your measurement area in
order to check the transformation parameters and settings.
• Activate the positioning as described in 17.1.
• Select
and then select
Land survey
,
Note:
All elements are saved on the layer set in the layer manager when they are recorded.
The acquisition / recording is controlled by the icons from the work bar. Tapping on
will open
hidden icons of the recording. Tap on a required icon to add it to the work bar. The following icons are
available for acquisition / recording:
•
Stores the position of a point.
•
Stores a line made up of two points. Tap
for the first point of the line, tap
for the end
point of the line.
•
Creates a curved line over three points. Tap
for the starting point of the line, tap
for the
midpoint of the line, tap
for the end point the line. The line is drawn as an arc over the three
measured points.
•
Creates a polyline over two or more points. For the starting point of the polyline tap on
or
activate a point by tapping in the graphic. Tap
for each additional point of the polyline.