L900 MIU Pit and Wall Installation and Maintenance Guide
15
Chapter 4: Wall Installation
This chapter describes storage and unpacking instructions, preliminary tests, tools,
materials, site selection, and wall installation of the L900 MIU.
Prior to Installation
Any existing network registers must be reprogrammed.
The L900 MIU is not capable of being networked.
Storage
After receipt, inspect shipping containers and contents for damage prior to storage.
After the inspection is complete, store the cartons in a clean, dry environment.
Keep in mind that the L900 MIU has an internal battery. Storage for more than one
year can affect product life. Be sure to use a first-in first-out inventory control
system. See "Environmental Conditions" on page 4.
Unpacking
As with all precision electronic instruments, the L900 MIU should be handled
carefully; however, no additional special handling is required.
After unpacking the L900 MIU, inspect for damage. If the L900 MIU appears to be
damaged or proves to be defective upon installation, notify your Neptune sales
representative. If one or more items requires reshipment, use the original cardboard
box and packing material.
Figure 13 – L900 MIU Wall Kit