Section 7: Performance and Safety Tests
7-11
Switch position
Baud rate
Switch 7
Switch 8
2400
Down
Up
4800
Down
Down
9600
Up
Down
19,200
Up
Up
8.
Set monitor to conversation format by setting DIP switch two up.
9.
At your test computer:
a.
Start communication port control software.
b.
Set communication software to agree with baud rate you set at
monitor.
c.
Once communication is established, type letter S .
d.
Verify monitor echoes letter S and then sends current saturation
value followed by a carriage return and linefeed.
SAFETY TESTS
The following safety tests are required:
•
Ground integrity
•
Electrical leakage
Ground Integrity
This test verifies the integrity of the power cord ground wire from the AC
plug and connection with the monitor chassis ground.
1.
Set electrical safety analyzer Function to Ground Resistance Test; set
range to Milliohms.
2.
Connect monitor AC plug to analyzer as recommended by analyzer
operating instructions.
3.
Connect analyzer resistance input lead to grounding stud on rear panel
of monitor.
4.
Verify analyzer indicates 0.150 (150 milliohms) or less.
Electrical Leakage
These tests verify the electrical leakage of the monitor. There are three tests
you must perform:
•
Chassis source current
•
Patient source current
•
Patient sink current
Chassis Source Current
1.
Set electrical safety analyzer Function to Leakage and Range to
Microamps.
Summary of Contents for N-180
Page 26: ......
Page 71: ...Section 7 Performance and Safety Tests 7 13...
Page 72: ......
Page 76: ......
Page 81: ...10 2...