2. Handling of dual voltage type generating
sets.
Be sure to place the changeover switch
in the correct position for the rated voltage
of the working instrument.
The main switch should always be kept in the
“ON” position during operation.
Before starting the engine, be sure to turn the switches of the working instrument
(lighting apparatus, motor, etc.) to their
“OFF” position. If the switches are not “OFF”,
the sudden application of load when the engine is started could be very dangerous.
3.5 How to open the cabinet door and covers of LDE series generating set
1. Open the cabinet door for daily
inspection.
Turn the lever counterclockwise and
Raise the door.
2. Loosen the bolt of the air cleaner
Check port cover to check the air
cleaner.
3. Screw off the wing nut to open the
cover, the check the nozzle cover.
3.6 Break-in period operation
The first 20hrs are the break-in period of the engine, the operator must obey to following
items:
Warm up the engine 5 minutes after the initial starting. Run the engine at low
speed and zero load before the engine becomes warm.
CAUTION
Summary of Contents for BDE2200E
Page 12: ...2 1 Parts name BDE series E X type...
Page 13: ...2 1 Parts name BDE series T type...
Page 21: ......
Page 22: ......
Page 36: ...Electric Wiring Diagram for All Types of the Set 1 C type electric wiring diagram...
Page 37: ...2 X type electric wiring diagram single voltage output...
Page 38: ...3 X type electric wiring diagram double voltage output...
Page 39: ...4 E type electric wiring diagram single voltage output...
Page 40: ...5 E type electric wiring diagram double voltage output...
Page 41: ...6 T type electric wiring diagram...
Page 43: ...8 X3 E3 type electric principle diagram...
Page 44: ...CANNON TOOLS LTD 20 Station Road Rowley Regis West Midlands B65 0JU U K Made in China...