![NEC Storage Performance Monitor/Optimizer User Manual Download Page 100](http://html.mh-extra.com/html/nec/storage-performance-monitor-optimizer/storage-performance-monitor-optimizer_user-manual_251467100.webp)
Chapter 6 Operation of Performance Optimization Function (GUI)
II-18
(8) Status
Bar
Displays the operating state of the NEC Storage PerformanceOptimizer client. Table 6-7 provides descriptions
of each display item.
Table 6-7 Display Items for Status Bar
Display item
Description
Operating state
Displays the current operating state. Displayed contents are as follows:
Information acquiring .... Indicates that disk array configuration information or Busy Ratio
information is being collected from the iSM server.
Working
.... Indicates that the NEC Storage PerformanceOptimizer client is
operating.
Stop
.... Indicates that the NEC Storage PerformanceOptimizer client has
stopped due to a disconnection with the iSM server or a cancellation
instruction provided on the Information acquiring dialog screen.
When the client is connected to the iSM server, the operation can be
resumed by selecting “Update to The Current Information” from the
menu.
Interval for updating logical
disk transfer progress
information
Numerical values displayed next to the operating state are the interval for updating logical disk
transfer progress information.
This interval is for updating logical disk transfer progress information shown on the screen.
The value is the same as the interval for checking transfer progress of a logical disk specified in the
environment setting of the iSM server. Numerical values in the range from 5 seconds to 30
seconds are displayed.