![background image](http://html.mh-extra.com/html/nec/np600cm/np600cm_installation-and-assembly-manual_251016008.webp)
ISSUED: 08-05-08 SHEET #: 056-9008-6 06-28-10
Visit the Peerless Web Site at www.peerlessmounts.com
8 of 10
For customer care call 1-800-865-2112 or 708-865-8870.
Align shoulder on connection block (
EE
) oppo-
site notch in adapter plate (
AA
). Attach adapter
plate to connection block (
EE
) from projector
mount
assembly (
A
) using two #10-32 x 3/8" serrated
washer head socket pin screws (
C
) as shown
in fi gure 5.1. Tighten screws using 4 mm allen
wrench (
B
).
C
NOTCH INDICATES
FRONT OF PROJECTOR
SHOULDER
Attaching Adapter Plate to Projector
fi g. 5.1
BB
Flip projector upside down and attach adapter plate (
AA
) using three serrated socket pin screws (
BB
) and
retaining spacers (
CC
) as shown below. Tighten using 4 mm allen wrench (
B
).
NOTE:
Retaining spacers (
CC
) go between the projector and adapter plate (
AA
).
AA
CC
AA
EE
5
6