Chapter 1

   

Preparation for Installation 

This chapter describes preparations required for installing the server on a 19-inch rack step by 
step. 

Step 1 

Unpacking 

The rack conversion kit contains the following components. Make sure that everything listed 
below are inside and no damage is observed after unpacking. 

 
 

 
 

 
 
 

 
 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 

 
 
 

19 

18 

17 

10 

11 

12 

13,14 

15 

16 

20 

21 

22 

Summary of Contents for N8143-56F/56E

Page 1: ...ectly and or personal injury or damages of surrounding servers to occur More than two persons are required to carry or install the rack Failure to follow this instruction may cause the rack to fall to...

Page 2: ...d for installing the server on a 19 inch rack step by step Step 1 Unpacking The rack conversion kit contains the following components Make sure that everything listed below are inside and no damage is...

Page 3: ...xed HDD model 11 HDD Cover 2 1 For Hot Plug ATA HDD model 12 Template 1 13 Model Name Label 1 120Lg 120Ef 14 Model Name Label 1 120Lh 120Lg 15 Icon Label 1 16 Washer 8 For fixing the slide rail assemb...

Page 4: ...ut Then slide the front bezel to remove it from the other hinge pin and remove the front bezel 2 Remove the bezel hinge four screws 3 Remove five nylon rivets from the top cover 4 Remove four feet fro...

Page 5: ...s model Fixed HDD 4slots model Fix HDD cover 1 with four screws D Hot Plug ATA HDD 4slots model Fix HDD cover 2 with two screws D 7 Fix four foot covers with four screws C to the bottom of server 8 Fi...

Page 6: ...ail 2 Fix the inner rail with eight screws A to both sides of the server 3 Place the template in the desired location of the rack and attach four core nuts that come with the rack assembly to the moun...

Page 7: ...Place slide rail assemblies to the mounting flanges of the rack Attach the washer to the screw B and then fix both sides of slide rails with eight screws B Refer to the template for the position 6 Ti...

Page 8: ...slide the server all the way into the rack 10 To check that the server slides in and out of the rack grasp the two handles on the front of the server slowly pull the server out and push it back in 11...

Page 9: ...to the back of the server 2 When the distance between the front mounting flange and the rear mounting flange is about 743mm align one end of the cable arm with the outside of the core nuts installed t...

Page 10: ...arm and the arm bracket and then fix the cable arm with two screws D to the arm bracket that fixed in step 1 Distance between the front mounting flange and the rear mounting flange 700_742mm Cable Ar...

Page 11: ...ied to the cable arm by rotating it 7 Attach cables to the server according to the manual of the server 8 Bundle cables to the cable arm by the repeat ties Attach cables and repeat ties not to contact...

Page 12: ...nge of the power supply unit Check to see that no excess force is applied to cables by rotating it If the excess force is applied to cables tie again cables more slackly and check to see that no exces...

Page 13: ...label corresponding to each model on the front cover Icon Label Model Name Label 10mm 10mm Model Name Label Icon For NEC Express5800 120Ef For NEC Express5800 120Lg For NEC Express5800 120Lg For NEC E...

Page 14: ...escribes the procedures for rotating the cable arm to backside 1 Loosen the screw D and slide the arm stopper to upside and then remove the arm stopper 2 Rotate the cable arm to backside 3 Attach remo...

Page 15: ...osen four captive thumbscrews on the front of the server 2 Grasp the two handles on the front of the server slowly pull it out until it stops locks by the release levers 3 Do the maintenance of intern...