121
Power Control
The Power Control allows you to power on/off/cycle the remote host system. Additionally you can
hard reset/diagnostic interrupt the remote host system. You can also see the remote power status
in this screen.
To perform the power control operation, select the operation and click
Apply Changes
.
Summary of Contents for Express5800/T71f
Page 1: ...NEC Express5800 T71f User s Guide PART NO PRINTED IN TAIWAN...
Page 24: ...12 System Block Diagram...
Page 40: ...28 Connect to CABLE Connect to CABLE Connect to CABLE...
Page 43: ...31 HDD Installation Sequence...
Page 53: ...41 CPU Configuration...
Page 56: ...44 SATA Configuration...
Page 62: ...50 Serial Port Console Redirection...
Page 92: ...80 Event Log Configuration...
Page 105: ...93 6 BIOS updated...
Page 115: ...103 Properties Properties displays the firmware version of current remote client system...
Page 141: ...129...